Infinity

Not logged in
Home

❯

Trial Runs

❯

DryRun_Demo_Q TEST

❯

CF01

❯

output

❯

RFQ at a Glance — Q TEST

RFQ at a Glance — Q-TEST

Counts & Anchors

  • Files: 5; Pages: n/a (extracts)
  • Top‑3 Anchors: MR; Datasheet; Instrumentation Spec

Cross‑References (samples)

  • Hazardous area rules: “H₂ units must be IIC T3…” — Project Datasheet (2-MM5173-40-SPE-1907-00), p.2, Note 7
  • EMC/Surge/Tests: ADNOC Instrumentation Specification (4422-JK-SE-000000180001_00), p.12, Sec 4.3

Complexity

  • Medium — mixed area classes, dual power architecture, multi‑standard checks

Missing Docs

  • None (for mock); in real run, attach specific titles from MR referenced list

Integrity Issues

  • None (mock). In real runs, list unreadables with exact paths and generate RFI lines.

Revisions Timeline (summary)

  • MR A1; Datasheet Rev.01

TQ Tracker

  • Initialized (no entries yet)

Product Groups

  • Tank Shower; Chiller (optional); Portable Eyewash

Next Best Action

  • Proceed to CF01 completeness and RFI drafting if gaps appear.

Loading authentication...

Graph View

Backlinks

  • Safety Shower MVP

Created with Infinity Constructor © 2025

  • Elynox | Go Further