Infinity

Not logged in
Home

❯

Trial Runs

❯

DryRun_Demo_Q TEST

❯

CF04

❯

output

❯

Technical Handoff Summary — Q TEST

Technical Handoff Summary — Q-TEST

Overview

  • Counts by area class: H₂ (IIC required) units: 2; Non‑H₂: 3; Utility: 1; Eyewash: 1
  • Compliance highlights: 76 LPM shower; 11.4 LPM eye/facewash; 15 min discharge; tepid range; Arabic/English signage; CCR indication via proximity switches
  • Open RFIs/TQs: Power feed confirmation; IIC certification per component; IP motor upgrade; IFAT/CIT/SIT inclusion; AVL alternates
  • CPQ Notes: IIC options; motor enclosure/upgrade; test plan service

Revisions & Open Items

  • MR A1; Datasheet Rev.01 — no deltas in mock; track in revision log
  • TQs: none (mock)

Citations

  • Datasheet (2-MM5173-40-SPE-1907-00), p.2, Note 7
  • Inst Spec (4422-JK-SE-000000180001_00), p.12, Sec 4.3
  • Offer (Q-TEST-1)

Loading authentication...

Graph View

Backlinks

  • Safety Shower MVP

Created with Infinity Constructor © 2025

  • Elynox | Go Further