Metrics — Q-TEST Dry Run
Project: Q-TEST | Customer: ADNOC | Complexity: Medium | Efficiency Target: ≥70% time reduction (pilot)
Summary Metrics
- Files processed: 5
- Pages processed: n/a (extracts)
- High-risk requirements (count): 3
- RFIs drafted (count): 1
- Deviations proposed / accepted: 4 / 0 (mock)
- Open items (TQs/RFIs pending): Power feed; IIC component certs; IP motor upgrade; Test scope; AVL
CF01
- Anchors confirmed: MR/Datasheet/Inst Spec
- Missing Docs list: none (mock)
- Integrity issues: none (mock)
- Revisions timeline summary: MR A1; Datasheet Rev.01
- TQ tracker count: 0 (mock)
CF02
- Requirements extracted: 5
- High-risk surfaced: 3
- Normalization issues resolved: n/a (mock)
CF03
- Dual power detected: Y
- Weakest-link area class: IIB T4 (offered) vs IIC T3 required (H₂)
- Deviation candidates flagged: power/area/IP/tests/AVL
- CPQ implications: IIC options; IP enclosure; test plan
CF04
- Handoff summary generated: Y
- Prequalification annex included: N
- Submission email drafted: N (mock)
Notes & Lessons
- Standards integration into run-of-show reduced context switching; citation guardrails effective.