Metrics — Q TEST Dry Run

Metrics — Q-TEST Dry Run

Project: Q-TEST | Customer: ADNOC | Complexity: Medium | Efficiency Target: ≥70% time reduction (pilot)

Summary Metrics

  • Files processed: 5
  • Pages processed: n/a (extracts)
  • High-risk requirements (count): 3
  • RFIs drafted (count): 1
  • Deviations proposed / accepted: 4 / 0 (mock)
  • Open items (TQs/RFIs pending): Power feed; IIC component certs; IP motor upgrade; Test scope; AVL

CF01

  • Anchors confirmed: MR/Datasheet/Inst Spec
  • Missing Docs list: none (mock)
  • Integrity issues: none (mock)
  • Revisions timeline summary: MR A1; Datasheet Rev.01
  • TQ tracker count: 0 (mock)

CF02

  • Requirements extracted: 5
  • High-risk surfaced: 3
  • Normalization issues resolved: n/a (mock)

CF03

  • Dual power detected: Y
  • Weakest-link area class: IIB T4 (offered) vs IIC T3 required (H₂)
  • Deviation candidates flagged: power/area/IP/tests/AVL
  • CPQ implications: IIC options; IP enclosure; test plan

CF04

  • Handoff summary generated: Y
  • Prequalification annex included: N
  • Submission email drafted: N (mock)

Notes & Lessons

  • Standards integration into run-of-show reduced context switching; citation guardrails effective.