Technical Handoff Summary — Q-21699 (Saipem COMP2)

  • Customer/EPC: Saipem — COMP2
  • Client_Profile: Other
  • Solution: EXP‑MH‑14KS/1500 tank shower + STD‑68G portable eye wash and accessories

Compliance highlights (with citations)

  • Ingress minima: IP66 outdoors; splash zone IP67 required (200-51-IN-SPC-00021_00, lines 1721–1725).
  • Hazardous area: Datasheet states ATEX Zone 1/2, Gas groups IIA/IIB, Temp Class T3; IIC available; non‑flameproof variant also available (Datasheets and CoCs.md, lines 212–218; 468–471). Variant locked to FLP Ex d per spec §6.4 (200-51-IN-SPC-00021_00, lines 1771–1780).
  • Power: Electrical supply 240 V single phase 50/60 Hz; immersion heater 3 kW @ 230 V (Datasheets and CoCs.md, lines 216–219). Spec baseline references 230 Vac UPS for packages (200-51-IN-SPC-00021_00, lines 2020–2049). Decision: include FLP Ex d step‑down transformer 240→230 Vac sized for 3 kW heater.
  • Flow: Shower 76 L/min; Eye/face wash 12 L/min; EN/ANSI (Datasheets and CoCs.md, lines 224–227).

Hazardous‑area matrix and weakest‑link

  • See CF03/output/Hazards_Component_Matrix_Q-21699.md. Weakest‑link flag: true (IP66/67 evidence for field enclosures missing; EMC/ATEX register pending).

Evidence Pack (Attached/Parked)

  • EP‑001..EP‑006 — Attached (see CF04/output/Attachments_Manifest_Q-21699.md).
  • Parked: EP‑007 EMC Declaration; EP‑008 ATEX/IECEx Equipment Register; EP‑009 IP Certificates Pack.

Open RFIs / Deviations

  • RFI‑IP: Provide IP66/IP67 certificates for JB/sign box/chiller per IEC 60529 (spec lines 1721–1725).
  • RFI‑EMC: Provide EMC/EMI declaration (IEC 61000‑6‑2/‑6‑4 or IEC 61326; NAMUR NE 21). Referenced but not attached (Quality Documents.md, lines 741–742; 751–752).
  • RFI‑FLP/BOM: Provide certificates showing Ex d protection concept for Zone 1 equipment; confirm any IIC selections if applicable.

Power alignment decision

  • Decision (b) selected: Include transformer 240→230 Vac (FLP Ex d), sized for 3 kW heater; feed from 230 Vac UPS per spec (lines 2020–2049). Link to CPQ mapping.

CPQ notes

  • BOM to specify FLP Ex d variant and include Ex d transformer, Ex d JB/signage as applicable; add EP references when received.

Revisions & Open Items

  • Evidence Pack gate: PASS (Attached/Parked mirrored). EMC/ATEX register pending (RFI‑EMC).
  • Cross‑walk gate: PASS for cited High‑Risk anchors; Missing_Source rows include RFI links.
  • CF03 gate: hazards matrix present; weakest_link_flag true; statuses pending vendor confirmations.
  • CF04 gate: attachments manifest present; links resolve to repo‑relative paths.