Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32705

❯

CF04

❯

output

❯

Appendix 2 — Technical Deviation List (Q 32705)

Appendix 2 — Technical Deviation List (Q-32705)

Pos.Document, Code and Standard ParagraphDocument RequirementDeviation Description and Technical JustificationContractor ResponseCompany AcceptanceStatus
D01Tank DS EXP‑MH‑14KS/1500 (lines 105–111)ATEX Zone 1 & 2; IIA/IIB; T3; IIC availableConfigure IIC variants across assembly if IIC is mandated by EPC; provide matching certification.A — Provide IIC variants if requiredAccepted — IIC mandated; configure IIC‑certified components and supply certificate EP‑002. Citations: Tank DS lines 105–111; EPC dwg 200‑91‑EL‑DWG‑00032_B lines 24305–24311.Closed
D02Offer Q‑32705‑1 (lines 50–52)Power topology acceptanceAccept separate external feeds: 230/240V 1Φ for heater; 3Φ for chillerA — Standard packaged topologyAccepted — Separate feeds as offered. Citation: Offer Q‑32705‑1 p.1 lines 50–52.Closed

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further