Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32705

❯

CF04

❯

output

❯

Appendix 3 — Technical Clarification List (Q 32705)

Appendix 3 — Technical Clarification List (Q-32705)

Pos.Document, Code and Standard ParagraphDocument RequirementClarification DescriptionContractor ResponseStatus
C01Hazardous Area classificationIIC requirement if applicablePlease confirm whether IIC classification is required for the safety shower and chiller assembly.If IIC is mandated, we will configure IIC‑certified components and supply matching certificates.
Why Closed (citations): Tank DS lines 105–111; EPC dwg 200‑91‑EL‑DWG‑00032_B lines 24305–24311.
Closed
C02Power supply topologyAcceptance of separate feedsPlease confirm acceptance of separate external feeds: 230/240V 1Φ to heater; 3Φ to chiller, per offer.We can maintain separate feeds as offered; alternatively, we can scope internal distribution if a single feed is mandated.
Why Closed (citation): Offer Q‑32705‑1 p.1 lines 50–52.
Closed

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further