Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32705

❯

Metrics — Episode 2 (Q 32705)

Metrics — Episode 2 (Q-32705)

Client_Profile: Other (Qatar Energy; Saipem EPC)

CF01

  • Anchors confirmed: Offer; Tank DS; Chiller DS; EPC specs for EMC/IP/testing
  • Integrity issues: No MR; EPC specs used as governing references
  • TQ tracker count: 0
  • RFIs drafted: 2 (IIC requirement; power topology separate feeds)

CF02

  • High‑Risk rows created: HazArea, EMC, IP, Chiller Classification, Alarms/CCR, Labeling, Painting/Coating, Testing
  • Cross‑walk updated with exact file paths and line ranges (High‑Risk rows 100% covered)
  • Evidence Pack enumerated (EP‑001 EMC; EP‑002 Ex; EP‑003 IP extract)

CF03

  • Weakest‑link: IIB T4 via chiller unless IIC mandated
  • Dual power: TRUE (separate 1Φ heater + 3Φ chiller)
  • Deviation candidates: D‑001 (IIC if mandated); D‑002 (power topology)

CF04

  • Packet skeleton remapped to current repo paths; executive summary refreshed; appendices and manifests updated
  • Evidence completeness %: 0% attached; 100% enumerated (3/3 items parked with filenames)
  • EPC exact‑citation coverage % (High‑Risk rows): 100% via Spec Cross‑walk
  • RFIs closed: 2 (C01 IIC; C02 separate feeds)
  • Deviations accepted: 2 (D01, D02)
  • High‑Risk finalized count: 5

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further