Metrics — Episode 2 (Q-32705)
Client_Profile: Other (Qatar Energy; Saipem EPC)
CF01
- Anchors confirmed: Offer; Tank DS; Chiller DS; EPC specs for EMC/IP/testing
- Integrity issues: No MR; EPC specs used as governing references
- TQ tracker count: 0
- RFIs drafted: 2 (IIC requirement; power topology separate feeds)
CF02
- High‑Risk rows created: HazArea, EMC, IP, Chiller Classification, Alarms/CCR, Labeling, Painting/Coating, Testing
- Cross‑walk updated with exact file paths and line ranges (High‑Risk rows 100% covered)
- Evidence Pack enumerated (EP‑001 EMC; EP‑002 Ex; EP‑003 IP extract)
CF03
- Weakest‑link: IIB T4 via chiller unless IIC mandated
- Dual power: TRUE (separate 1Φ heater + 3Φ chiller)
- Deviation candidates: D‑001 (IIC if mandated); D‑002 (power topology)
CF04
- Packet skeleton remapped to current repo paths; executive summary refreshed; appendices and manifests updated
- Evidence completeness %: 0% attached; 100% enumerated (3/3 items parked with filenames)
- EPC exact‑citation coverage % (High‑Risk rows): 100% via Spec Cross‑walk
- RFIs closed: 2 (C01 IIC; C02 separate feeds)
- Deviations accepted: 2 (D01, D02)
- High‑Risk finalized count: 5