Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32859

❯

CF03

❯

output

❯

CPQ Pre Entry List — Q 32859

CPQ Pre-Entry List — Q-32859

Client_Profile: ADNOC

Subsystem: Tank Shower EXP‑MH‑14KS/1500

  • Base Unit: EXP‑MH‑14KS/1500 (Qty 28) [Offer p.1 46–66]
  • Eye/Facewash Internal (TS E/F (1500) INTERNAL) (Qty 28) [Offer p.2 130–137]
  • Foot Treadle K‑Range (Qty 28) [Offer p.2 140–147]
  • LED Light Zone‑1 (Qty 28) [Offer p.2 183–191]
  • Proximity Switch (primary) (Qty 28) [Offer p.2 150–157]
  • Proximity Switch (second) (Qty 28) [Offer p.2 161–169]
  • SS316 Interface JB (Alarm) (Qty 28) [Offer p.2 173–181]
  • SS316 Interface JB (Heater/Light) (Qty 28) [Offer p.2 200–211]
  • GRP Panels (Qty 28) [Offer p.2 225–233]
  • Sump/GRP Grating (Qty 28) [Offer p.2 235–243]
  • Flanges 2” Drain / 1” Inlet (Qty 28 each) [Offer p.2 247–265]
  • Access Hatch (Qty 28) [Offer p.2 268–276]
  • Sun Canopy (Qty 28) [Offer p.2 279–286]
  • Nameplate (Qty 28) [Offer p.2 289–295]
  • Tagging (Qty 56 tags) [Offer p.2 297–305]

Subsystem: Chiller Package

  • Chiller Unit Zone‑1 IIB T3, 3 kW (Qty 28) [Offer p.4 360–366]
  • Interconnecting Pipework SS (Qty 28) [Offer p.4 371–377]
  • Fixing Bolts M12 SS316 (Qty 28) [Offer p.4 381–387]

RFI‑Pending Flags

  • Haz‑area Gas Group IIC requirement confirmation (RFI #1)
  • Power topology confirmation: single external 415 VAC 3Φ feed with chiller‑provided 230 VAC (RFI #2)

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further