Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32859

❯

CF04

❯

output

❯

Technical Handoff Summary — Q 32859 (Internal)

Technical Handoff Summary — Q-32859 (Internal)

Client_Profile: ADNOC | EPC: NMDC Energy (Ruwais LNG)

Configured counts by area class (current evidence)

  • 28 Tank Showers EXP‑MH‑14KS/1500 (base: Zone 1/2 IIA/IIB T3; IIC variant available)
  • 28 Chillers (Zone‑1 IIB T3)
  • Weakest‑link: IIB T3 via chiller; IP weakest element = IP55 (pump motor)

Compliance highlights (with citations)

  • Performance: 76 LPM shower, 12 LPM eye/facewash (Datasheet lines 117–119)
  • Hazards: Ex claims per datasheets; IIC variant available for tank shower (lines 105–111)
  • Electrical: 415 VAC 3Φ chiller; 230/240 VAC shower feed (Offer p.4 364–366; Datasheet 109–113)
  • Alarms & CCR: Proximity switches (primary + secondary) with SS316 JBs (Offer p.2 150–211)
  • Painting: A‑22 per AGES‑SP‑07‑004 (Offer p.2 125–127)

Accepted deviations (draft)

  • D‑001: Haz‑area gas group (IIC confirmation for H₂) — pending client confirmation; selection change only
  • D‑002: Power topology (single 3Φ external feed; chiller provides 230 VAC to shower) — confirmation only

Open RFIs/TQs

  • RFI‑1: Confirm IIC T3 end‑to‑end for H₂ service (Datasheet/Chiller citations)
  • RFI‑2: Confirm single external 415 VAC 3Φ with chiller‑provided 230 VAC to shower
  • TQs: None recorded at intake

CPQ notes

  • Include proximity switch sets (primary/secondary), SS316 JBs (alarm + heater/light), LED light, GRP panels, sump/grating, flanges, access hatch, canopy, nameplate, tagging.

Revisions & Open Items

  • MR RLNG‑000‑HS‑R‑8851 Rev.0 (IFQ 2025‑05‑02); Offer Q‑32859‑1 (2025‑06‑16)
  • Open items: RFI‑1 (IIC), RFI‑2 (power topology), finalize matrix export to XLSX.

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further