Episode 10 — Onramp (Tecnmont SKIKDA)
Objective
- Reduce time to enter flow by starting from Episode 9 outputs; clear weakest‑link flags by attaching evidence, finalize statuses, and ready client‑facing annexes.
Saliency Landscape (project‑tied)
- Anchors already established:
- Variant/Power (offer):
Reference Examples/Q-32976 - Tecnmont SKIKDA/Q-32976-1 Priced Commercial Offer.md
, lines 75–78; 235–237; 487–489;.../Datasheet with GAD - EXP-MH-14KS-1500.md
, lines 116–123; 440–442 - Spec IP minima:
.../RFQ Files/4439-SS-SS-008006_0.md
, lines 1250–1257 - Optional chiller IP/power:
.../Optional flameproof_chiller_zone_1.md
, line 72; lines 75–80; 267–275; offer option lines 760–768 - EMC/61326/NAMUR refs (codes index):
.../Reference Documents/4439-YZ-PC-000000018_1.md
, lines 4579–4580; 4627–4629; 5560–5562
- Variant/Power (offer):
- High‑Risk focus: EMC declaration; ATEX/IECEx certs; JB/signage Ex/IP proof; outdoor IP target (IP66 vs IP65); optional chiller selection/power variant.
Inputs (open in split view)
- SoT CSV:
Trial Runs/Q-32976/CF02/output/Compliance_Matrix_Extended.csv
- Hazards Matrix:
Trial Runs/Q-32976/CF03/output/Hazards_Component_Matrix_Q-32976.md
- Decision Table:
Trial Runs/Q-32976/CF03/output/Decision_Table_Q-32976.md
- Cross‑walk:
Trial Runs/Q-32976/CF02/output/Spec_Crosswalk_Q-32976.md
- RFI draft:
Trial Runs/Q-32976/CF01/output/RFI_Q-32976_EMC_and_Certificates.md
- Annex manifests:
Trial Runs/Q-32976/CF04/output/Evidence_Pack_Checklist_Q-32976.md
;.../Attachments_Manifest_Q-32976.md
;.../Spec_Reference_Register_Q-32976.md
Step Plan (TOTE‑aligned)
- Evidence Attachment & Status Flip
- Test: EP statuses Parked?
- Operate: Attach vendor EMC declaration (IEC 61000‑6‑2/‑6‑4; IEC 61326; NAMUR NE 21), ATEX Declaration, Type Exam, JB/signage Ex/IP certificates; update EP statuses to Attached; paste filenames/paths; mirror in CSV Decision_Notes.
- Test: Evidence Pack Gate satisfied; referenced‑only eliminated.
- Exit: PASS.
- IP Target Confirmation
- Test: Outdoor IP target unclear?
- Operate: Confirm IP66 vs spec IP65 requirement; if IP66 required, record upgrade path (JB/signage/beacon) and update Hazards Matrix/Decision Table.
- Test: weakest_link_flag cleared or justified.
- Exit: PASS.
- Optional Chiller Decision
- Test: Chiller unselected?
- Operate: Decide on chiller inclusion; if included, select power variant per site supply (230 V 1Φ vs 380–420 V 3Φ) and ensure Ex d/IP66 alignment. Update CPQ and Decision Table with citations.
- Test: cpq_list_present == true; linkage to Req_ID present.
- Exit: PASS.
- Status Consolidation & Annex Refresh
- Operate: Flip Partial→Compliant where evidence attached; refresh Technical Handoff Summary; ensure annex links resolve.
- Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present.
- Exit: PASS.
Standard Works (with rationale)
- CSV Coupling: Keep CSV as SoT; mirror EP Item_IDs in Decision_Notes. Rationale: prevents drift.
- Citation Precision: Maintain Doc_No + Section_Title + Page/Line_Range; repo‑relative paths only. Rationale: auditability.
- EP Mirroring: Attach/Park enumerated and mirrored across outputs. Rationale: avoids referenced‑only ambiguity.
- Variant/Power Gates: Keep booleans enforced before CF03 exit. Rationale: avoid late rework.
- CPQ Linking: Link CPQ items to Req_ID/Deviation_ID. Rationale: traceability.
Launch Checklist (operator)
- Attach EMC/ATEX/JB/IP evidence; flip statuses; mirror EP IDs in CSV Decision_Notes
- Confirm IP target; update hazards/decisions
- Decide chiller inclusion and power variant; update CPQ
- Refresh annexes and handoff summary
Ready Signal
- All links resolve; weakest_link_flag false or justified; Evidence Pack Gate PASS; CF03 Gate PASS with statuses finalized.