Episode 3 — Retrospective Ritual
Purpose
- Capture lessons and standard‑work deltas to tighten Episode 4 entry and sustain auditability across clients.
Participants (roles)
- Facilitator, Operator, Orchestrator, Scribe, Observer(s)
Timebox
- 15–20 minutes
Structure
- What worked (keep)
- CSV‑first matrix with strict citations; High‑Risk subset finalized with Status_Final
- Hazards/power weakest‑link method kept decisions clear; dual power surfaced early
- Evidence Pack discipline introduced to handle EMC/Ex docs gracefully
- Appendices auto‑population and deviations write‑back reduced assembly friction
- What didn’t (change)
- EMC evidence not always present in example sets → need Evidence Pack gate and placeholders
- MR citations initially section‑only → require exact line ranges at close
- Risks (mitigate)
- Citation drift for large specs → Spec Cross‑walk mapping per High‑Risk row
- Evidence gaps at submission → Evidence Pack checklist, tracked in manifests
- Improvements (standard‑work updates)
- Runbook: Added CF02 Spec Cross‑walk and Evidence Pack gate
- Prompt Packs: CF02 adds Painting/Labeling categories and evidence‑pack stub rule; CF03 adds Partially Compliant + pack reference
- Manifests: Attachments now include Evidence Pack section
- Metrics: Add evidence completeness %; MR exact‑citation coverage %
- Standards deltas (log refs)
- See
DryRun_RunOfShow.md
andMaster_Sequencing_MVP_Demo.md
edits; newEvidence_Pack_Checklist.md
andSpec_Crosswalk_Template.md
- Prompt Packs updated:
CF02_PromptPack_ADNOC.md
,CF03_PromptPack_ADNOC.md
- Action items → Episode 4 backlog
- Attach vendor EMC declarations; attach IECEx certificate(s) if IIC variant mandated
- Decide D‑003 motor IP upon client mandate; prepare upgrade option
- Prepare Spec Cross‑walk instance for High‑Risk rows (use template)
Exit
- Retro captured; deltas integrated; proceed to Episode 4 Onramp.