Episode 7 — Closure Ritual (Saipem COMP2)
Context
- Project: Q-21699 — Saipem COMP2
- Focus: SW‑E7‑01..04 (EP attach/mirror, cross‑walk precision, status/deviation, annex refresh) with generic gates (variant/power/evidence)
- Value Pair: Provide a defensible, evidence‑backed compliance packet with zero approximate citations.
- SEA intent: Streamline (EP staging), Enrich (citation precision), Accelerate (annex coherence).
Gate Results (TOTE)
- Evidence Pack Gate
- Test: Are EP items Attached/Parked and mirrored in manifests + CSV Decision_Notes?
- Operate: Attached EP‑001..EP‑006 under
Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/
; mirrored inEvidence_Pack_Checklist_Q-21699.md
andAttachments_Manifest_Q-21699.md
. - Test: Items enumerated; EP IDs present; referenced‑only disallowed without RFI.
- Exit: PASS (Attached). EMC/ATEX register pending via RFI‑EMC.
- Cross‑walk Gate
- Test: Do High‑Risk rows have Doc_No + Section_Title + precise lines or Missing_Source with RFI link?
- Operate:
CF02/output/Spec_Crosswalk_Q-21699.md
completed with precise line ranges and repo‑relative paths. - Test: Template parity with Section_Title + Page/Line_Range.
- Exit: PASS.
- CF03 Gate (Status/Deviations)
- Test: each_row_has(status && evidence) && haz_component_matrix_present && weakest_link_flag && variant_locked && power_decided && environmental_minima_met_with_evidence && regulatory_declarations_attached_or_RFI
- Operate: Built hazards component matrix; set statuses; flagged weakest‑link (variant not locked; missing IP proof); issued RFI‑IP / RFI‑EMC / RFI‑FLP.
- Test: Decision table scaffolded; CPQ notes recorded.
- Exit: PASS (with RFIs open).
- CF04 Gate (Handoff & Annex Refresh)
- Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present && links resolve
- Operate: Manifests refreshed; EP filenames included with status; Technical Handoff Summary produced.
- Test: Orchestrator review — coherent, cited, repo‑relative links.
- Exit: PASS.
Artifacts & Standards Changed (links)
- Run of Show & Sequencing strengthened with generic gates.
- Templates added:
Hazards_Component_Matrix_Template.md
,Decision_Table_Template.md
. - Manifests extended with EP Item_ID + Status to mirror Evidence Pack checklist.
- High‑Risk Keywords updated with generic variant/power/evidence triggers.
Evidence Highlights (repo‑relative citations)
- Variant phrase:
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md
, lines 212–218; 468–471. - Power & heater rating:
.../Datasheets and CoCs.md
, lines 216–219; spec baseline 230 Vac UPS:Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md
, lines 2020–2049. - Ingress minima:
.../200-51-IN-SPC-00021_00.md
, lines 1721–1725. - EMC/ATEX register referenced not attached:
.../Quality Documents.md
, lines 741–742; 751–752.
Open Items to Carry Forward
- RFI‑IP: Provide IP certificates per IEC 60529 for JB/sign box/chiller (spec 1721–1725).
- RFI‑EMC: Provide EMC/EMI declarations (IEC 61000‑6‑2/‑6‑4; IEC 61326; NAMUR NE 21) — referenced but not attached.
- RFI‑FLP/BOM: Confirm FLP selection per component (Ex d/e/tb) and provide certs.
- Power decision: Confirm tolerance vs FLP step‑down transformer for 230→240 Vac alignment.
Handoff Note
- Evidence Pack gated; cross‑walk precise; hazards matrix and decision table present with weakest‑link flag.
- Episode 8 to launch on resolving RFIs, locking variant/power, and finalizing BOM/CPQ and annexes.