Episode 7 — Onramp (Saipem COMP2)
Objective
Reduce time to flow by coupling to salient open items from Episode 6 and executing attachment, cross‑walk, and annex finalization tasks with standards enforced.
Saliency Landscape (from Ep6)
- Open RFIs:
- RFI‑IP (enclosure IP per IEC 60529 for JB/sign box/chiller) — cite:
Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md
, 1721–1725. - RFI‑EMC (EMC/EMI declaration: IEC 61000‑6‑2/‑6‑4 or IEC 61326; NAMUR NE 21) — cite:
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Quality Documents.md
, 741–742; 751–752. - RFI‑FLP/BOM (explicit FLP selections + protection concept per component) — cite:
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md
, 468–471.
- RFI‑IP (enclosure IP per IEC 60529 for JB/sign box/chiller) — cite:
- EP Items to attach: EP‑001..EP‑006 (datasheets/CoCs per
Rev 1 Quote Sent/Datasheets and CoCs.md
). - Power alignment confirmation (offer 240V 1Ph 3 kW vs site baseline) — cite:
.../Datasheets and CoCs.md
, 216–219.
Inputs (open and ready)
- Standards & SOPs:
- RFQ Workflow:
Discovery Documentation/Safety Shower RFQ Workflow.md
- Run of Show:
Design & Build Workshop/MVP Documentation/Safety Shower MVP.md
- Sequencing:
Design & Build Workshop/MVP Documentation/MVP Sequencing.md
- Evidence Pack Checklist:
Design & Build Workshop/MVP Documentation/Standard Work/reference/Evidence_Pack_Checklist.md
- Spec Cross‑walk Template:
Design & Build Workshop/MVP Documentation/Standard Work/templates/Spec_Crosswalk_Template.md
- Spec Reference Register:
Design & Build Workshop/MVP Documentation/Standard Work/templates/Spec_Reference_Register_Template.md
- Citation Style:
Design & Build Workshop/MVP Documentation/Standard Work/reference/Citation_Style.md
- RFQ Workflow:
- Example source (Saipem COMP2):
Reference Examples/Q-21699 - Saipem COMP2
(Rev 1 outcomes present).
Step Plan (TOTE‑aligned)
- SW‑E7‑01 Evidence Attach & Mirror (Execute Ep6 plan)
- Test: Are EP files present under
Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/
? - Operate: Attach EP‑001..EP‑006 using filenames from
Rev 1 Quote Sent/Datasheets and CoCs.md
; set Status to Attached; mirror Item_IDs in CSV Decision_Notes and in Attachments Manifest. - Test: Evidence Pack checklist shows Attached; links resolve.
- Exit: EP gate = PASS.
- SW‑E7‑02 Cross‑walk Precision Finalization
- Test: Do all High‑Risk rows have Doc_No + Section_Title + Page/Line_Range?
- Operate: Complete cross‑walk entries referencing spec and datasheet lines:
- IP minima:
.../200-51-IN-SPC-00021_00.md
, 1721–1725. - Hazard area/T‑Class:
.../Datasheets and CoCs.md
, 212–218. - Power/flow:
.../Datasheets and CoCs.md
, 216–219; 224–227.
- IP minima:
- Test: crosswalk_complete == true.
- Exit: Cross‑walk gate = PASS.
- SW‑E7‑03 Status/Deviation Closure
- Test: each_row_has(status && evidence) AND haz_component_matrix_present AND weakest_link_flag == true.
- Operate: Close variant dependency (confirm FLP BOM) and power alignment; finalize deviations or variants; update Spec Reference Register with EP IDs and any RFI links.
- Test: Decision table coherent; deviations appended to library if applicable.
- Exit: CF03 gate = PASS.
- SW‑E7‑04 Annex Finalization & Handoff
- Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present && links resolve.
- Operate: Refresh manifests to enumerate only referenced items; include EP filenames; produce Technical Handoff Summary per Run of Show.
- Test: Orchestrator review passes; packet skeleton clean.
- Exit: CF04 gate = PASS.
Standard Works (embedded)
- EP staging & mirroring: see Run of Show (CF03 pre‑step) and Evidence Pack Checklist usage.
- Cross‑walk fields: use Section_Title + Page/Line_Range.
- Variant/power checks: Sequencing CF03 bullets.
- Spec Reference Register: maintain Doc_No | Title | File_Path | Status | EP Item_ID | RFI_Link.
Pass/Fail Gates
- Evidence Pack Gate: all EP items attached or explicitly Parked with filenames; mirrored in Decision_Notes.
- Cross‑walk Gate: all High‑Risk rows precise; Missing_Source rows include RFI links.
- CF03 Gate: statuses evidence‑backed; hazards table complete; deviations drafted or variants confirmed.
- CF04 Gate: annex manifests coherent; all links resolve.
Launch Checklist (operator)
- Create/verify
Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/
. - Attach EP‑001..EP‑006; set Attached; mirror IDs in CSV Decision_Notes.
- Complete cross‑walk with Section_Title + Page/Line_Range.
- Resolve FLP BOM & power alignment; draft/close deviations.
- Refresh annex manifests; export handoff.
Notes
- CSV remains authoritative; no schema changes.
- Use repo‑relative paths; if you can’t cite it, you can’t claim it.