Episode 7 — Onramp (Saipem COMP2)

Episode 7 — Onramp (Saipem COMP2)

Objective

Reduce time to flow by coupling to salient open items from Episode 6 and executing attachment, cross‑walk, and annex finalization tasks with standards enforced.

Saliency Landscape (from Ep6)

  • Open RFIs:
    • RFI‑IP (enclosure IP per IEC 60529 for JB/sign box/chiller) — cite: Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md, 1721–1725.
    • RFI‑EMC (EMC/EMI declaration: IEC 61000‑6‑2/‑6‑4 or IEC 61326; NAMUR NE 21) — cite: Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Quality Documents.md, 741–742; 751–752.
    • RFI‑FLP/BOM (explicit FLP selections + protection concept per component) — cite: Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md, 468–471.
  • EP Items to attach: EP‑001..EP‑006 (datasheets/CoCs per Rev 1 Quote Sent/Datasheets and CoCs.md).
  • Power alignment confirmation (offer 240V 1Ph 3 kW vs site baseline) — cite: .../Datasheets and CoCs.md, 216–219.

Inputs (open and ready)

  • Standards & SOPs:
    • RFQ Workflow: Discovery Documentation/Safety Shower RFQ Workflow.md
    • Run of Show: Design & Build Workshop/MVP Documentation/Safety Shower MVP.md
    • Sequencing: Design & Build Workshop/MVP Documentation/MVP Sequencing.md
    • Evidence Pack Checklist: Design & Build Workshop/MVP Documentation/Standard Work/reference/Evidence_Pack_Checklist.md
    • Spec Cross‑walk Template: Design & Build Workshop/MVP Documentation/Standard Work/templates/Spec_Crosswalk_Template.md
    • Spec Reference Register: Design & Build Workshop/MVP Documentation/Standard Work/templates/Spec_Reference_Register_Template.md
    • Citation Style: Design & Build Workshop/MVP Documentation/Standard Work/reference/Citation_Style.md
  • Example source (Saipem COMP2): Reference Examples/Q-21699 - Saipem COMP2 (Rev 1 outcomes present).

Step Plan (TOTE‑aligned)

  1. SW‑E7‑01 Evidence Attach & Mirror (Execute Ep6 plan)
  • Test: Are EP files present under Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/?
  • Operate: Attach EP‑001..EP‑006 using filenames from Rev 1 Quote Sent/Datasheets and CoCs.md; set Status to Attached; mirror Item_IDs in CSV Decision_Notes and in Attachments Manifest.
  • Test: Evidence Pack checklist shows Attached; links resolve.
  • Exit: EP gate = PASS.
  1. SW‑E7‑02 Cross‑walk Precision Finalization
  • Test: Do all High‑Risk rows have Doc_No + Section_Title + Page/Line_Range?
  • Operate: Complete cross‑walk entries referencing spec and datasheet lines:
    • IP minima: .../200-51-IN-SPC-00021_00.md, 1721–1725.
    • Hazard area/T‑Class: .../Datasheets and CoCs.md, 212–218.
    • Power/flow: .../Datasheets and CoCs.md, 216–219; 224–227.
  • Test: crosswalk_complete == true.
  • Exit: Cross‑walk gate = PASS.
  1. SW‑E7‑03 Status/Deviation Closure
  • Test: each_row_has(status && evidence) AND haz_component_matrix_present AND weakest_link_flag == true.
  • Operate: Close variant dependency (confirm FLP BOM) and power alignment; finalize deviations or variants; update Spec Reference Register with EP IDs and any RFI links.
  • Test: Decision table coherent; deviations appended to library if applicable.
  • Exit: CF03 gate = PASS.
  1. SW‑E7‑04 Annex Finalization & Handoff
  • Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present && links resolve.
  • Operate: Refresh manifests to enumerate only referenced items; include EP filenames; produce Technical Handoff Summary per Run of Show.
  • Test: Orchestrator review passes; packet skeleton clean.
  • Exit: CF04 gate = PASS.

Standard Works (embedded)

  • EP staging & mirroring: see Run of Show (CF03 pre‑step) and Evidence Pack Checklist usage.
  • Cross‑walk fields: use Section_Title + Page/Line_Range.
  • Variant/power checks: Sequencing CF03 bullets.
  • Spec Reference Register: maintain Doc_No | Title | File_Path | Status | EP Item_ID | RFI_Link.

Pass/Fail Gates

  • Evidence Pack Gate: all EP items attached or explicitly Parked with filenames; mirrored in Decision_Notes.
  • Cross‑walk Gate: all High‑Risk rows precise; Missing_Source rows include RFI links.
  • CF03 Gate: statuses evidence‑backed; hazards table complete; deviations drafted or variants confirmed.
  • CF04 Gate: annex manifests coherent; all links resolve.

Launch Checklist (operator)

  • Create/verify Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/.
  • Attach EP‑001..EP‑006; set Attached; mirror IDs in CSV Decision_Notes.
  • Complete cross‑walk with Section_Title + Page/Line_Range.
  • Resolve FLP BOM & power alignment; draft/close deviations.
  • Refresh annex manifests; export handoff.

Notes

  • CSV remains authoritative; no schema changes.
  • Use repo‑relative paths; if you can’t cite it, you can’t claim it.