Episode 8 — Closure Ritual (Saipem COMP2)
Context
- Project: Q-21699 — Saipem COMP2
- Objective: Close open RFIs (IP/EMC/FLP), lock variant/power decisions, finalize BOM/CPQ, refresh annexes for client-ready handoff with strict citation discipline.
- Value Pair: Deliver a defensible, evidence‑backed compliance packet with zero approximate citations.
- SEA intent: Enrich (citation precision, variant/power lock), Accelerate (annex coherence), Streamline (EP mirroring).
Gate Results (TOTE)
- Evidence Pack Gate
- Test: Are EP items Attached/Parked and mirrored in manifests + CSV Decision_Notes?
- Operate: Attached EP‑001..EP‑006 under
Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/
; added parked EP‑007 (EMC), EP‑008 (ATEX/IECEx register), EP‑009 (IP certificates). Mirrored inEvidence_Pack_Checklist_Q-21699.md
,Attachments_Manifest_Q-21699.md
, andCF02/output/Compliance_Matrix_Extended.csv
Decision_Notes. - Test: Items enumerated with statuses; referenced‑only disallowed without RFI.
- Exit: PASS — Attached/Parked mirrored. EMC/register/IP pending vendor response (RFIs open).
- Cross‑walk Gate
- Test: Do High‑Risk rows have Doc_No + Section_Title + precise lines or Missing_Source with RFI link?
- Operate:
CF02/output/Spec_Crosswalk_Q-21699.md
extended withR-HAZ-002
(Ex d default, lines 1771–1780). - Test: Template parity with Section_Title + Page/Line_Range.
- Exit: PASS.
- CF03 Gate (Status/Deviations)
- Test: each_row_has(status && evidence) && haz_component_matrix_present && weakest_link_flag && variant_locked && power_decided && environmental_minima_met_with_evidence && regulatory_declarations_attached_or_RFI
- Operate: Locked variant to FLP Ex d; decided to include step‑down transformer 240→230 Vac for 3 kW heater; updated Hazards Component Matrix and Decision Table; staged EP items; recomputed weakest‑link.
- Test: Decision Table and Hazards Matrix updated with evidence and EP links.
- Exit: PASS (with RFIs open for IP/EMC/FLP certs).
- CF04 Gate (Handoff & Annex Refresh)
- Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present && links resolve
- Operate: Refreshed manifests; materialized Spec Reference Register; updated Technical Handoff Summary.
- Test: Links are repo‑relative and resolve.
- Exit: PASS.
Decisions (with citations)
- Variant: FLP Ex d selected per spec §6.4 and offer variant availability
- Spec Ex d default:
Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md
, lines 1771–1780. - Offer variant availability:
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md
, lines 468–471; hazardous area note lines 212–218.
- Spec Ex d default:
- Power: Include Ex d step‑down transformer 240→230 Vac sized for 3 kW heater; feed from 230 Vac UPS
- Offer supply and heater rating:
.../Datasheets and CoCs.md
, lines 216–219. - Spec baseline UPS supply:
.../200-51-IN-SPC-00021_00.md
, lines 2020–2049.
- Offer supply and heater rating:
- Evidence posture:
- IP minima: IP66 outdoors; splash zone IP67 —
200-51-IN-SPC-00021_00.md
, lines 1721–1725; EP‑009 Parked; RFI‑IP open. - EMC/register: quality pack references register but not attached —
Quality Documents.md
, lines 741–742; 751–752; EP‑007/EP‑008 Parked; RFI‑EMC open.
- IP minima: IP66 outdoors; splash zone IP67 —
Artifacts Updated (repo‑relative)
- RFIs:
Trial Runs/Q-21699 - Saipem COMP2/CF01/output/RFIs_Q-21699.md
- Spec Cross‑walk:
Trial Runs/Q-21699 - Saipem COMP2/CF02/output/Spec_Crosswalk_Q-21699.md
- Compliance Matrix CSV (SoT):
Trial Runs/Q-21699 - Saipem COMP2/CF02/output/Compliance_Matrix_Extended.csv
- Hazards Matrix:
Trial Runs/Q-21699 - Saipem COMP2/CF03/output/Hazards_Component_Matrix_Q-21699.md
- Decision Table:
Trial Runs/Q-21699 - Saipem COMP2/CF03/output/Decision_Table_Q-21699.md
- CPQ Mapping:
Trial Runs/Q-21699 - Saipem COMP2/CF03/output/CPQ_Mapping_Q-21699.md
- Evidence Pack Checklist:
Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Evidence_Pack_Checklist_Q-21699.md
- Attachments Manifest:
Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Attachments_Manifest_Q-21699.md
- Spec Reference Register:
Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Spec_Reference_Register_Q-21699.md
- Technical Handoff Summary:
Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Technical_Handoff_Summary_Q-21699.md
- Changelog entry:
Trial Runs/quality-check/CHANGELOG_MVP_Updates.md
(Episode 8)
Evidence Highlights (precise citations)
- Variant dependency & power:
.../Datasheets and CoCs.md
, lines 212–219; 468–471. - IP minima (outdoor/splash):
.../200-51-IN-SPC-00021_00.md
, lines 1721–1725. - Ex d default (field instruments):
.../200-51-IN-SPC-00021_00.md
, lines 1771–1780. - Power baseline (UPS distribution):
.../200-51-IN-SPC-00021_00.md
, lines 2020–2049. - EMC/ATEX register referenced:
.../Quality Documents.md
, lines 741–742; 751–752.
Standard Works (formalized with rationale)
- CSV Coupling Rubric (SoT)
- Standard: Maintain
Compliance_Matrix_Extended.csv
as source‑of‑truth; mirror EP Item_IDs inDecision_Notes
. - Rationale: Ensures downstream consistency and auditability across artifacts.
- Standard: Maintain
- EP Mirroring Policy
- Standard: Every EP item is Attached or Parked; statuses mirrored across Evidence Pack checklist, Attachments Manifest, and CSV Decision_Notes.
- Rationale: Eliminates referenced‑only ambiguity; enforces Evidence Pack gate.
- Citation Style Enforcement
- Standard: Doc_No + Section_Title + Page/Line_Range; repo‑relative paths only (
Design & Build Workshop/.../Citation_Style.md
). - Rationale: Zero‑approximation citations enable external audit and rapid re‑location.
- Standard: Doc_No + Section_Title + Page/Line_Range; repo‑relative paths only (
- Variant & Power Gates
- Standard: In CF03, require explicit Variant_Decision per component and Power_Decision per site baseline; block exit if unset.
- Rationale: Prevents late rework; drives CPQ accuracy.
- CPQ Mapping Linking
- Standard: Group by subsystem; link each row to Req_ID/Deviation_ID; include implied Ex d ancillaries where variant/power decisions require them.
- Rationale: Speeds CPQ entry and keeps config traceable to requirements.
Ready for Episode 9
- Status: All Episode 8 gates passed with RFIs tracked; artifacts updated and linked with precise citations.
- Handoff: This closure ritual and updated artifacts are sufficient to launch Episode 9 without referring to chat.