Infinity

Not logged in
Home

❯

Trial Runs

❯

quality check

❯

Episode 8 — Closure Ritual (Saipem COMP2)

Episode 8 — Closure Ritual (Saipem COMP2)

Context

  • Project: Q-21699 — Saipem COMP2
  • Objective: Close open RFIs (IP/EMC/FLP), lock variant/power decisions, finalize BOM/CPQ, refresh annexes for client-ready handoff with strict citation discipline.
  • Value Pair: Deliver a defensible, evidence‑backed compliance packet with zero approximate citations.
  • SEA intent: Enrich (citation precision, variant/power lock), Accelerate (annex coherence), Streamline (EP mirroring).

Gate Results (TOTE)

  1. Evidence Pack Gate
  • Test: Are EP items Attached/Parked and mirrored in manifests + CSV Decision_Notes?
  • Operate: Attached EP‑001..EP‑006 under Trial Runs/Q-21699 - Saipem COMP2/CF04/input/EP/; added parked EP‑007 (EMC), EP‑008 (ATEX/IECEx register), EP‑009 (IP certificates). Mirrored in Evidence_Pack_Checklist_Q-21699.md, Attachments_Manifest_Q-21699.md, and CF02/output/Compliance_Matrix_Extended.csv Decision_Notes.
  • Test: Items enumerated with statuses; referenced‑only disallowed without RFI.
  • Exit: PASS — Attached/Parked mirrored. EMC/register/IP pending vendor response (RFIs open).
  1. Cross‑walk Gate
  • Test: Do High‑Risk rows have Doc_No + Section_Title + precise lines or Missing_Source with RFI link?
  • Operate: CF02/output/Spec_Crosswalk_Q-21699.md extended with R-HAZ-002 (Ex d default, lines 1771–1780).
  • Test: Template parity with Section_Title + Page/Line_Range.
  • Exit: PASS.
  1. CF03 Gate (Status/Deviations)
  • Test: each_row_has(status && evidence) && haz_component_matrix_present && weakest_link_flag && variant_locked && power_decided && environmental_minima_met_with_evidence && regulatory_declarations_attached_or_RFI
  • Operate: Locked variant to FLP Ex d; decided to include step‑down transformer 240→230 Vac for 3 kW heater; updated Hazards Component Matrix and Decision Table; staged EP items; recomputed weakest‑link.
  • Test: Decision Table and Hazards Matrix updated with evidence and EP links.
  • Exit: PASS (with RFIs open for IP/EMC/FLP certs).
  1. CF04 Gate (Handoff & Annex Refresh)
  • Test: attachments_manifest_present && quality_docs_manifest_present && reference_list_present && links resolve
  • Operate: Refreshed manifests; materialized Spec Reference Register; updated Technical Handoff Summary.
  • Test: Links are repo‑relative and resolve.
  • Exit: PASS.

Decisions (with citations)

  • Variant: FLP Ex d selected per spec §6.4 and offer variant availability
    • Spec Ex d default: Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md, lines 1771–1780.
    • Offer variant availability: Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md, lines 468–471; hazardous area note lines 212–218.
  • Power: Include Ex d step‑down transformer 240→230 Vac sized for 3 kW heater; feed from 230 Vac UPS
    • Offer supply and heater rating: .../Datasheets and CoCs.md, lines 216–219.
    • Spec baseline UPS supply: .../200-51-IN-SPC-00021_00.md, lines 2020–2049.
  • Evidence posture:
    • IP minima: IP66 outdoors; splash zone IP67 — 200-51-IN-SPC-00021_00.md, lines 1721–1725; EP‑009 Parked; RFI‑IP open.
    • EMC/register: quality pack references register but not attached — Quality Documents.md, lines 741–742; 751–752; EP‑007/EP‑008 Parked; RFI‑EMC open.

Artifacts Updated (repo‑relative)

  • RFIs: Trial Runs/Q-21699 - Saipem COMP2/CF01/output/RFIs_Q-21699.md
  • Spec Cross‑walk: Trial Runs/Q-21699 - Saipem COMP2/CF02/output/Spec_Crosswalk_Q-21699.md
  • Compliance Matrix CSV (SoT): Trial Runs/Q-21699 - Saipem COMP2/CF02/output/Compliance_Matrix_Extended.csv
  • Hazards Matrix: Trial Runs/Q-21699 - Saipem COMP2/CF03/output/Hazards_Component_Matrix_Q-21699.md
  • Decision Table: Trial Runs/Q-21699 - Saipem COMP2/CF03/output/Decision_Table_Q-21699.md
  • CPQ Mapping: Trial Runs/Q-21699 - Saipem COMP2/CF03/output/CPQ_Mapping_Q-21699.md
  • Evidence Pack Checklist: Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Evidence_Pack_Checklist_Q-21699.md
  • Attachments Manifest: Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Attachments_Manifest_Q-21699.md
  • Spec Reference Register: Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Spec_Reference_Register_Q-21699.md
  • Technical Handoff Summary: Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Technical_Handoff_Summary_Q-21699.md
  • Changelog entry: Trial Runs/quality-check/CHANGELOG_MVP_Updates.md (Episode 8)

Evidence Highlights (precise citations)

  • Variant dependency & power: .../Datasheets and CoCs.md, lines 212–219; 468–471.
  • IP minima (outdoor/splash): .../200-51-IN-SPC-00021_00.md, lines 1721–1725.
  • Ex d default (field instruments): .../200-51-IN-SPC-00021_00.md, lines 1771–1780.
  • Power baseline (UPS distribution): .../200-51-IN-SPC-00021_00.md, lines 2020–2049.
  • EMC/ATEX register referenced: .../Quality Documents.md, lines 741–742; 751–752.

Standard Works (formalized with rationale)

  • CSV Coupling Rubric (SoT)
    • Standard: Maintain Compliance_Matrix_Extended.csv as source‑of‑truth; mirror EP Item_IDs in Decision_Notes.
    • Rationale: Ensures downstream consistency and auditability across artifacts.
  • EP Mirroring Policy
    • Standard: Every EP item is Attached or Parked; statuses mirrored across Evidence Pack checklist, Attachments Manifest, and CSV Decision_Notes.
    • Rationale: Eliminates referenced‑only ambiguity; enforces Evidence Pack gate.
  • Citation Style Enforcement
    • Standard: Doc_No + Section_Title + Page/Line_Range; repo‑relative paths only (Design & Build Workshop/.../Citation_Style.md).
    • Rationale: Zero‑approximation citations enable external audit and rapid re‑location.
  • Variant & Power Gates
    • Standard: In CF03, require explicit Variant_Decision per component and Power_Decision per site baseline; block exit if unset.
    • Rationale: Prevents late rework; drives CPQ accuracy.
  • CPQ Mapping Linking
    • Standard: Group by subsystem; link each row to Req_ID/Deviation_ID; include implied Ex d ancillaries where variant/power decisions require them.
    • Rationale: Speeds CPQ entry and keeps config traceable to requirements.

Ready for Episode 9

  • Status: All Episode 8 gates passed with RFIs tracked; artifacts updated and linked with precise citations.
  • Handoff: This closure ritual and updated artifacts are sufficient to launch Episode 9 without referring to chat.

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further