Deviation Report — Template (ADNOC Projects)
Info
Project: {PROJECT_NAME}
Client (EPC): {EPC_NAME}
Vendor: {VENDOR_NAME}
Quote Ref: {QUOTE_REF}
Prepared by: {YOUR_NAME} • Date: 2025-08-12
Summary Table
Deviation_ID | Requirement (verbatim + source) | Offered Provision (quote + page/line) | Impact (perf/safety/install/schedule/cost) | Risk | Classification | Proposed Resolution (A/B/C) | Owner | Status |
---|
Note
Classification: Minor = editorial/trace; Major = technical performance, safety, certification, electrical class, or testing scope.
Detailed Entries (one section per deviation)
{Deviation_ID}
Client Requirement
“{Requirement_text}”
Source: {Source_Doc} ({Doc_No}), p. {Page}, {Note/Clause}
Offered Provision
“{Offer_snippet}”
Source: {Offer_Doc}, p./line {Offer_Page_or_Line}
Gap / Difference
- {What_differs}
Technical Justification
- {Why_acceptable_or_equivalent}
- Evidence: {Evidence_docs_with_pages}
Impact Assessment
- Performance: {impact_perf}
- Safety: {impact_safety}
- Installation: {impact_install}
- Schedule/Cost: {impact_sched_cost}
Proposed Client Wording
{Proposed_writing_for_client}
CPQ Implication
- {Codes_or_options}
RFI Link (if any)
- {RFI_reference_or_URL}
Internal Approvals
- Engineering: ____ • QA/Compliance: ____ • Sales: ____
Common Pre‑seeded Topics (use if applicable)
Example
- Power supply — 415 VAC 3Φ project baseline vs 230/240 VAC 1Φ on tank shower; chiller provides 230 VAC feed.
- Ingress Protection — Instruments ≥ IP65; check lowest‑rated element (e.g., motor IP55).
- Hazardous Area — H₂ units must be IIC T3 across all electrical/instrument items.
- EMC / Surge — IEC 61000/61326 and IEC 62305 confirmation.
- Testing scope — FAT, SAT, IFAT, CIT, SIT.
- AVL/Sub-vendors — Use of non‑AVL subcomponents.
- Materials/Painting — A‑22 paint system, SS316 pipe; SCH40 vs SCH80 rationale.
- Language/Signage & Alarms — Arabic/English signs; local + remote indication to CCR (limit switches).
Notes
Warning
- Always include document citations (doc name + doc no + page + clause/note).
- Keep language clear and client‑safe.
- Link each Deviation_ID back to the compliance matrix.