Metrics Template — Demo/Validation
Project: {Quote Ref} | Customer: {EPC} | Complexity: {Low/Med/High} | Efficiency Target: ≥70% time reduction (pilot)
Summary Metrics
- Files processed: {N}
- Pages processed: {N}
- High-risk requirements (count): {N}
- RFIs drafted (count): {N}
- Deviations proposed / accepted: {N} / {N}
- Open items (TQs/RFIs pending): {list}
CF01
- Anchors confirmed: {MR/Datasheet/Inst Spec}
- Missing Docs list: {items}
- Integrity issues: {files}
- Revisions timeline summary: {text}
- TQ tracker count: {N}
CF02
- Requirements extracted: {N}
- High-risk surfaced: {N}
- Normalization issues resolved: {notes}
CF03
- Dual power detected: {Y/N}
- Weakest-link area class: {class}
- Deviation candidates flagged: {list}
- CPQ implications: {notes}
- Variant locked: {Y/N}
- Power decided: {Y/N}
- Environmental minima satisfied with evidence: {Y/N}
- Regulatory declarations attached (or RFIs raised): {summary}
CF04
- Handoff summary generated: {Y/N}
- Prequalification annex included: {Y/N}
- Submission email drafted: {Y/N}
- Evidence completeness % (Attached/Enumerated): {A%}/{E%}
- EPC exact-citation coverage % (High‑Risk rows): {X%}
- RFIs closed: {N}; Deviations accepted: {N}
- High‑Risk finalized count: {N}
Notes & Lessons
- {free text}