CHANGELOG — MVP Updates
Context
- Project: Q-32705 — Saipem COMP3 | Episode: 4→5 transition
- Objective: Improve adherence to The Infinity Method Grammar and the Safety Shower RFQ Workflow while reducing time-to-flow for Episode 5
Summary of updates
- Run of Show (Safety Shower MVP)
- Added path remap micro‑step in CF04; strengthened Evidence Pack gate (manifest mirroring + CSV Decision_Notes EP IDs); appended “Appendices Closure Rule” (Why Closed + citations)
- Master Sequencing (MVP Sequencing)
- Added 0a Repo Path Remap; tightened SpecCrosswalk assert to allow Missing_Source with RFI note; added csv_is_source_of_truth assert under EvidencePackGate
- Standards (reference/templates)
- Citation_Style: EP Decision_Notes examples; repo‑relative path example; precise line guidance
- Spec_Crosswalk_Template: repo‑relative paths requirement; Missing_Source→RFI note; allow EP Item_ID in Notes
- Evidence_Pack_Checklist: Status normalized (Pending/Parked/Attached); mirroring into Manifest + CSV Decision_Notes
- Appendix2_Technical_Deviation_List_Template & Appendix3_Technical_Clarification_List_Template: “Why Closed” requirement
- Metrics_Template: Episode 4 metrics fields (evidence completeness %, citation coverage %, RFIs closed, deviations accepted, High‑Risk finalized)
- Episode rituals and onramp
- Episode_4_Closure_Ritual: Gate checks and TOTE; added cross‑links in references
- Episode_4_Retrospective_Ritual: SEA wins, friction; standards deltas cross‑linked
- Episode_5_Onramp: Inputs, saliency, SW‑E5‑01..04, TOTE, pass/fail gates, kickoff script
Rationale (Infinity Method coupling)
- SEA: Streamline entry (path remap; operator scripts); Enrich quality (citations precision; EP mirroring; Missing_Source policy); Accelerate handoff (explicit gates + DoD)
- TOTE: Each gate includes Test criteria, Operate action, Re‑Test, Exit conditions
- Friction Lens: Addressed path migration, evidence attachment ambiguity, missing sources, and citation precision
Actionable guidance for next episode
- Use repo‑relative paths only (e.g.,
Reference Examples/Q-32705 - Saipem COMP3/...
;Trial Runs/Q-32705/...
) - Enforce EP mirroring across Evidence_Pack_Checklist • Attachments Manifest • CSV Decision_Notes
- For Missing_Source in cross‑walk, create RFI using Targeted_RFI_Template and link back
- Maintain “Why Closed” citations in appendices; keep CSV as authoritative (no schema edits)
References
- Grammar & Heuristics: The Infinity Method Grammar • Heuristic - The SEA Framework • The TOTE Framework • Heuristic - The Friction Lens
- Workflow: Safety Shower RFQ Workflow
- Standards index: Standards_Catalog
Episode 5 — Q-32794 (Tecnicas — Stade LNG) — Standards Refinements
Context
- Source set:
Reference Examples/Q-32794 - Tecnicas - Stade LNG
(example outcomes) - Anchor RFQ:
RFQ Files/105101560-CP.md
— ATEX/HAC and spec references - Episode focus: SW‑E5‑01..04 (precision citations; EP readiness; Missing_Source→RFI; annex coherence)
Accepted refinements (Run of Show, Sequencing, Standards)
- RFQ Workflow
- Add CF01 test: “Referenced Spec Stub” — if a cited spec resolves to an empty stub (e.g.,
HEHTEF-000-L-ES-0021.md
,HEHTEF-000-T-SS-0004.md
), mark Missing_Source, draft an RFI, and create a Parked EP item. - Add CF01 test: “Bid‑phase ATEX minima present” — if language like “Minimum ATEX Protection will be confirmed during bid phase” is detected, generate an “ATEX minima by tag/zone/T‑class” RFI before CF03.
- Add CF01 test: “Referenced Spec Stub” — if a cited spec resolves to an empty stub (e.g.,
- Run of Show (Safety Shower MVP)
- Pre‑Flight: list Safety Shower Evidence Pack starters (Status Parked until attached): EP‑EL‑001 (Electrical Spec PDF), EP‑ATEX‑001 (CE ATEX Declaration), EP‑ATEX‑002 (ATEX Type Exam), EP‑ATEX‑003 (JB Ex‑d/IP certificate), EP‑SPEC‑001 (spec extract).
- CF01 Completeness & Targeted RFI: include canned prompts for (a) referenced spec stub; (b) ATEX minima by tag/zone/T‑class.
- Evidence Pack Gate: ensure any Partially Compliant or bid‑phase dependent row references an EP Item_ID.
- Master Sequencing (MVP Sequencing)
- 3) CF01.CompletenessAndRFI: “If referenced spec file is stub/empty, set Missing_Source, generate RFI, and add EP‑EL‑001 (Parked).”
- 5a) CF02.SpecCrosswalk: require Section_Title + exact line ranges in
Section/Lines
; add RFI link note for bid‑phase ATEX minima. -
- CF03.StatusAndHazardMatrix: add a “Voltage mismatch check” (230 Vac spec vs 240 Vac offer) and guidance to propose variant/deviation if needed.
- Standards
- Citation_Style: add explicit example using Doc_No + Section_Title + line range, e.g., “HEHTEF‑000‑T‑RQ‑0006 (TEF 105101560‑CP), §5.3.3, lines 586–589”.
- Spec_Crosswalk_Template: update example paths to
Reference Examples/Q‑XXXX/...
; note to include Section_Title withinSection/Lines
; reiterate Missing_Source→RFI. - Evidence_Pack_Checklist: pre‑seed common EP rows for Safety Showers (IDs above) as Parked items; require filename standards.
- Prompt Packs (CF01–CF03):
- CF01: insert “ATEX minima by tag” RFI snippet and “referenced spec stub” RFI snippet.
- CF02: enforce Section_Title+line ranges; add “Offer vs Spec voltage” check.
- CF03: hazards table to explicitly request JB protection concept evidence (Ex d vs Ex e) and IP minima.
Evidence from example (precise citations)
- ATEX/HAC requirement:
Reference Examples/Q-32794 - Tecnicas - Stade LNG/RFQ Files/105101560-CP.md
, §5.3.3 lines 586–589; §5.6.8 lines 1422–1454 - JB Ex‑d and bid‑phase minima: §5.3.3 lines 603, 605
- Power supply (spec): §5.3.3 lines 597–599; Offer (240 V):
Q-32794-1 - Tank Showers.md
lines 74–77
Rationale (SEA/TOTE/Friction)
- SEA: Streamline CF01 with early Missing_Source and ATEX minima tests; Enrich citations (Section_Title+lines) and EP standardization; Accelerate E5 by pre‑baked RFIs/EPs.
- TOTE: Add explicit Tests and Exit conditions for Missing_Source and bid‑phase dependencies.
- Friction: Repeated spec stubs, bid‑phase ATEX ambiguity, and voltage mismatch are predictable—codify them.
Episode reference
- Source episode:
Trial Runs/Q-32794
(Stade LNG example) — Episode 5 - Outputs:
CF02/output/Spec_Crosswalk_Q-32794.md
,CF04/output/Evidence_Pack_Checklist_Q-32794.md
,CF01/output/RFIs/*
,CF04/output/Attachments_Manifest_Q-32794.md
Episode 5 — Process Adherence Findings (RFQ Workflow × Infinity Grammar)
Findings (continuous improvement)
- Value Pair + SEA: Add to the top of every Episode doc to anchor purpose and intent. Link to The Infinity Method Grammar and Heuristic - The SEA Framework.
- Spec Reference Register: Maintain a single table across episodes listing cited specs with Doc_No, Title, File_Path, Status (Complete/Stub), EP Item_ID, and RFI link. Surfaces Missing_Source early per Safety Shower RFQ Workflow.
- Hard TOTE Gates: For each decision gate (Evidence Pack, Cross‑walk, CF03, CF04), write explicit Test→Operate→Test→Exit blocks aligned to The TOTE Framework.
- ATEX/HAC Matrix by Tag: Track Tag • Zone • Gas Group • T‑Class • Protection Concept (JB/Heater/Other) • Evidence (EP IDs) to convert bid‑phase ambiguity into actionable asks.
- CSV Coupling Rubric: Micro‑checklist in every Episode doc — “High‑Risk rows traced to CSV IDs; Decision_Notes mirror EP Item_IDs; no schema changes.”
- Evidence Pack Starters: Pre‑seed EP‑EL‑001, EP‑ATEX‑001/002/003, EP‑SPEC‑001 per Evidence_Pack_Checklist.
- Citation Precision: Require Doc_No + Section_Title + line range; reinforce examples in Citation_Style and ensure
Section/Lines
in Spec_Crosswalk_Template captures the title. - Prompt Hooks: Add canned RFI prompts in CF01 for (a) referenced spec stub via Targeted_RFI_Template and (b) ATEX minima by tag/zone/T‑class; CF02 add “Offer vs Spec voltage” check; CF03 hazards table explicitly asks for JB protection concept/IP evidence.
Applied updates
- Closure + Onramp updated:
[[Trial Runs/quality-check/Episode_5_Closure_Ritual]]
: Added Value Pair/SEA headers, CSV coupling rubric, and reinforced TOTE gates[[Trial Runs/quality-check/Episode_6_Onramp]]
: Added Spec Reference Register and ATEX/HAC Matrix templates, mismatch register, kickoff script; cross‑links to Safety Shower MVP, MVP Sequencing, Standards_Catalog
Rationale
- Tightens adherence to Safety Shower RFQ Workflow through visible Tests, early Missing_Source handling, and evidence traceability aligned to CSV as SoT.
Episode 6 — Q-21699 (Saipem — COMP2) — Standards Refinements
Context
- Source set:
Reference Examples/Q-21699 - Saipem COMP2
(manual outcomes present underRev 1 Quote Sent/
) - Episode focus: SW‑E6‑01..04 (EP attach/mirror, cross‑walk precision, status/deviation, annex refresh)
Accepted refinements (Run of Show, Sequencing, Standards)
- Run of Show (Safety Shower MVP): add CF03 pre‑step to stage Evidence Pack items (Parked) and mirror EP Item_IDs before status/deviation.
- Master Sequencing (MVP Sequencing):
- CF02: auto‑trigger RFI‑IP / RFI‑EMC when specs include ingress (IP66/IP67 per IEC 60529) or EMC (IEC 61000/IEC 61326/NAMUR) and offers lack explicit evidence.
- CF02 Cross‑walk: require Section_Title + Page/Line_Range.
- CF03: add Variant dependency check for FLP vs non‑FLP selection and Power supply alignment check; add preliminary EP staging.
- Templates & Standards:
- Spec_Crosswalk_Template: split
Section/Lines
intoSection_Title
andPage/Line_Range
. - Citation_Style: add Section_Title + Page/Line citation example.
- Evidence_Pack_Checklist: EMC example row includes Missing_Source→RFI note.
- Standards_Catalog: add link to new Spec_Reference_Register_Template; note early EP staging and variant dependency under Gaps.
- New: Spec_Reference_Register_Template.
- Spec_Crosswalk_Template: split
Evidence from example (precise citations)
- IP minima (spec):
Reference Examples/Q-21699 - Saipem COMP2/RFQ Files/Instrumentation/200-51-IN-SPC-00021_00.md
, lines 1721–1725. - Hazard area/T‑Class and variant note (datasheet):
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md
, lines 212–218; 468–471. - Flow and power (datasheet):
.../Datasheets and CoCs.md
, lines 224–227; 216–219. - EMC/ATEX register referenced but not attached (quality pack):
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Quality Documents.md
, lines 741–742; 751–752.
Rationale (SEA/TOTE/Friction)
- Streamline: early EP staging reduces CF03 back‑and‑forth; auto RFIs in CF02 cut delay.
- Enrich: cross‑walk precision improved; Spec Reference Register standardizes Missing_Source handling.
- Accelerate: variant/power checks make CF03 decisions faster; EP mirroring ensures gate readiness.
Episode reference
- Source episode:
Trial Runs/Q-21699
— Episode 6 (Saipem COMP2)
Episode 7 — Q-21699 (Saipem — COMP2) — Generic Refinements
Context
- Objective: Incorporate pattern-based refinements without overfitting to a single example; enforce variant/power/evidence gates.
Accepted refinements (Run of Show, Sequencing, Standards, Workflow)
- Master Sequencing (
Design & Build Workshop/MVP Documentation/MVP Sequencing.md
):- CF02 Auto‑trigger (generic) for variant‑available phrasing, power terms, and referenced‑but‑missing declarations → pre‑populate targeted RFIs.
- CF03 asserts strengthened: add
variant_locked
,power_decided
,environmental_minima_met_with_evidence
,regulatory_declarations_attached_or_RFI
.
- Run of Show (
Design & Build Workshop/MVP Documentation/Safety Shower MVP.md
):- CF03 guardrails (generic) to block exit when Variant/Power/Environmental/Regulatory gates are unmet for High‑Risk rows.
- Citation Style (
Design & Build Workshop/MVP Documentation/Standard Work/reference/Citation_Style.md
):- Added generic examples for citing variant‑available notes and referenced‑but‑missing declarations.
- Evidence Pack Checklist (
Design & Build Workshop/MVP Documentation/Standard Work/reference/Evidence_Pack_Checklist.md
):- Added generic Certificate/Declaration/Register row guidance; clarified referenced‑only is not acceptable (attach or RFI).
- RFQ Workflow (
Discovery Documentation/Safety Shower RFQ Workflow.md
):- Added generic detection test in early scans (variants/power/evidence) and a CF03 pre‑exit gate test for Variant/Power/Environmental/Regulatory checks.
Grounding (example citations)
- Variant phrase and optioning present:
Reference Examples/Q-21699 - Saipem COMP2/Rev 1 Quote Sent/Datasheets and CoCs.md
, lines 212–218; 468–471;Q-21699_Technical Offer.md
, lines 526–528. - Power baseline vs offer and transformer feasibility: Spec
.../Instrumentation/200-51-IN-SPC-00021_00.md
, lines 2020–2049; Offer.../Datasheets and CoCs.md
, lines 216–219; Transformer shown inQ-21699_Technical Offer.md
, lines 3453–3463. - Evidence referenced but not attached (register):
Rev 1 Quote Sent/Quality Documents.md
, lines 741–742; 751–752.
Rationale
- Generic, pattern‑based gates reduce overfit risk while preserving auditability and accelerating decisions across varied examples.
Episode reference
- Source episode:
Trial Runs/Q-21699
— Episode 7 (Saipem COMP2)
Template updates (Episode 7)
-
Updated
Design & Build Workshop/MVP Documentation/Standard Work/templates/Spec_Crosswalk_Template.md
examples to repo‑relative paths. -
Added
Design & Build Workshop/MVP Documentation/Standard Work/templates/Hazards_Component_Matrix_Template.md
. -
Added
Design & Build Workshop/MVP Documentation/Standard Work/templates/Decision_Table_Template.md
. -
Extended
Design & Build Workshop/MVP Documentation/Standard Work/templates/Quality_Documents_Manifest_Template.md
with EP Item_ID and Status columns. -
Extended
Design & Build Workshop/MVP Documentation/Standard Work/templates/Datasheets_CoCs_Manifest_Template.md
with EP Item_ID and Status columns. -
Extended
Design & Build Workshop/MVP Documentation/Standard Work/templates/Targeted_RFI_Template.md
with a referenced‑but‑missing declarations bullet. -
Extended
Design & Build Workshop/MVP Documentation/Standard Work/templates/Metrics_Template.md
with variant/power/evidence gate metrics. -
Standards index updated to include:
Hazards_Component_Matrix_Template
andDecision_Table_Template
under Templates & Schemas.
Episode 8 — Q-21699 (Saipem — COMP2) — Decisions & Evidence
Context
- Objective: Close RFIs where possible; lock variant/power; finalize CPQ; refresh annexes.
Accepted refinements (Outputs)
- Hazards Matrix: Variant locked to FLP Ex d per spec §6.4 (200-51-IN-SPC-00021_00, 1771–1780). Statuses converted to Pending Evidence with explicit EP/RFI linkage.
- Decision Table: Power decision set to include step‑down transformer 240→230 Vac for 3 kW heater; notes cite spec 2020–2049 and offer lines 216–219.
- Cross‑walk: Added R‑HAZ‑002 row for Ex d default (lines 1771–1780) to drive component‑level protection concept.
- Evidence Pack: Added parked items — EP‑007 EMC Declaration; EP‑008 ATEX/IECEx Register; EP‑009 IP Certificates Pack — mirrored in manifest and RFIs.
- Handoff Summary: Refreshed to reflect locked variant, power decision, and parked EP items.
- CPQ Mapping: New file
Trial Runs/Q-21699 - Saipem COMP2/CF03/output/CPQ_Mapping_Q-21699.md
including Ex d transformer and Ex d ancillary enclosures linked to Req_IDs. - Spec Reference Register: Materialized at
Trial Runs/Q-21699 - Saipem COMP2/CF04/output/Spec_Reference_Register_Q-21699.md
with EP and RFI linkage.
Rationale
- Enforces Variant/Power/Regulatory gates; improves traceability; readies CPQ pre‑entry list.
Episode 9 — Q-32976 (Tecnmont — SKIKDA) — Onramp Outputs
- SoT: Created
Trial Runs/Q-32976/CF02/output/Compliance_Matrix_Extended.csv
from template; seeded High‑Risk rows R‑0001..R‑0004 with precise citations; mirrored EP Item_IDs in Decision_Notes per Citation_Style. - Cross‑walk: Added
CF02/output/Spec_Crosswalk_Q-32976.md
with Section_Title + Page/Line_Range. - Hazards: Materialized
CF03/output/Hazards_Component_Matrix_Q-32976.md
; set weakest_link_flag true pending JB/signage evidence; variant_locked required. - Decisions: Drafted
CF03/output/Decision_Table_Q-32976.md
; locked intent to FLP Ex d and 240V 1Ph pending confirmation; captured chiller power variants. - CPQ: Produced
CF03/output/CPQ_Mapping_Q-32976.md
with subsystem grouping and Req_ID links. - Annex: Created
CF04/output/Evidence_Pack_Checklist_Q-32976.md
,CF04/output/Attachments_Manifest_Q-32976.md
,CF04/output/Spec_Reference_Register_Q-32976.md
, andCF04/output/Technical_Handoff_Summary_Q-32976.md
. - Gates: Evidence Pack items staged as Parked; CF03 gates enforced (variant_locked, power_decided placeholders, hazards matrix present, weakest_link_flag true); regulatory declarations RFI prepared (EMC/ATEX) referencing
Reference Documents/4439-YZ-PC-000000018_1.md
lines 4579–4580; 5560–5562; 4627–4629.