Infinity

Not logged in
Home

❯

Trial Runs

❯

Q 32859

❯

CF04

❯

output

❯

Appendix 3 — Technical Clarification List (Template)

Appendix 3 — Technical Clarification List (Template)

Project: Ruwais LNG | Quote Ref: Q-32859-1 | MR: RLNG-000-HS-R-8851 | Rev: 0 | Status: Open

Pos.Document, Code and Standard ParagraphDocument RequirementClarification DescriptionContractor ResponseStatus
C01MR §12.2 + Datasheets (Ex classification)Haz‑area class and T‑class suitable for servicePlease confirm whether IIC T3 classification is required end‑to‑end for H₂ service units; if yes, supplier will provide IIC‑certified components across the assembly.For ADNOC H₂ service, we will configure IIC T3 end‑to‑end: tank shower IIC variant available (Datasheet EXP‑MH‑14KS/1500, lines 105–111). Chiller offered is Zone‑1 IIB T3 with IECEx certification; if IIC variant is mandated, we will supply matching certification in submittals.Closed
C02MR Electrical (pending extraction) + Offer p.4 364–366Supply topology alignment with site powerPlease confirm acceptance of single external 415 VAC 3Φ feed to chiller, with chiller‑provided 230/240 VAC to shower heater/light.Confirmed topology: single external 415 VAC 3Φ to chiller; 1Φ 230 VAC feed provided to shower (Offer Q‑32859‑1 p.4 lines 364–366; Datasheet lines 109–113).Closed

Notes

  • Use consistent citations per Citation_Style.
  • MVP demo: Auto-populate from CF01 Targeted RFI items where feasible; manual review before sharing externally.

Loading authentication...

Graph View

Created with Infinity Constructor © 2025

  • Elynox | Go Further