Infinity

Not logged in
Home

❯

Design & Build Workshop

❯

MVP Documentation

❯

Standard Work

❯

reference

❯

Citation Style — Reference

Citation Style — Reference

Requirements & Deviations

  • Always include: Source_Doc, Doc_No, Page, Clause/Note.
  • Preferred format (inline): “{Doc Name} ({Doc_No}), p.{Page}, {Note/Clause}”
  • Offers: “{Offer_Doc}, p./line {Offer_Page_or_Line}”

Examples

  • Datasheet reference: “Project Datasheet (2-MM5173-40-SPE-1907-00), p.2, Note 7”
  • Instrumentation spec: “ADNOC Instrumentation Specification (4422-JK-SE-000000180001_00), p.12, Sec 4.3”
  • Offer: “Q-32859-1 (Hughes Offer), line 154”
  • Evidence Pack in Decision_Notes: “EP-001 Hughes_EMC_Declaration_IEC61000_61326_NAMUR_NE21.pdf — Parked” | “EP-002 Chiller_ATEX_IECEx_CoC_IIB_T4.pdf — Attached”
  • Repo-relative path example: “Reference Examples/Q-32705 - Saipem COMP3/Chiller Unit Datasheet Zone-1.md, lines 64–66”
  • Section_Title + Page/Line example: “200-51-IN-SPC-00021_00 (Instrumentation), Sec Outdoor Ingress, lines 1721–1725”
  • Variant‑available example (generic): “Offer Datasheet (Doc_No), Availability note, lines X–Y: ‘Available as [Variant A] or [Variant B] — please specify preference’.”
  • Referenced‑but‑missing declaration example (generic): “Quality Pack (Doc_No), Sec [Title], lines X–Y — declaration/register referenced but not attached (RFI raised).”

Matrix Fields

  • Source_Section_or_Note: free text (e.g., Note 7; Sec 4.3)
  • Offer_Page_or_Line: number/string (e.g., 154; 2-11)

Guardrails

  • Verbatim in Requirement_text; no summaries.
  • No claim without a citation; block acceptance if missing.
  • Use repo-relative paths; avoid legacy placeholders.
  • Prefer precise line ranges (re-locate exact line before external share if approximate).

Loading authentication...

Graph View

Backlinks

  • Master_Sequencing_MVP_Demo
  • Dry-Run Run of Show — Safety Shower MVP (Standards-Enforced)
  • Standards Catalog — Safety Shower MVP
  • Appendix 2 — Technical Deviation List (Template)
  • Appendix 3 — Technical Clarification List (Template)
  • Appendix 2 — Technical Deviation List (Template)
  • Appendix 3 — Technical Clarification List (Template)
  • CHANGELOG — MVP Updates
  • Episode 1 — Closure Ritual
  • Episode 2 — Closure Ritual
  • Episode 2 — Retrospective Ritual
  • Episode 3 — Onramp
  • Episode 4 — Closure Ritual (Q-32705)
  • Episode 5 — Closure Ritual — Q-32794 (Tecnicas — Stade LNG)
  • Episode 5 — Onramp (Q-32705)
  • Episode 6 — Onramp — Q-32794 (Tecnicas — Stade LNG)
  • Safety Shower MVP

Created with Infinity Constructor © 2025

  • Elynox | Go Further