Episode 2 — Closure Ritual
Purpose
- Formally close Episode 2 with explicit quality gates, auditable artifacts, and a clean handoff state.
- Rationale: Ensures that Episode 3 launches without chat context and that all outputs are traceable per standards.
Pre‑conditions
- Workspace present:
Episode_2_Q-32859/
- Client_Profile set: ADNOC (see Client_Profile_Baselines)
- Standards toolkit open: Standards_Catalog
Inputs (produced in Episode 2)
- CF01:
Episode_2_Q-32859/CF01/output/Anchor_and_File_Map.md
,RFQ_at_a_Glance.md
,Quantity_Reconciliation.md
,Targeted_RFI.md
,TQ_Tracker.md
,Revision_Timeline_Log.md
- CF02:
Episode_2_Q-32859/CF02/output/Compliance_Matrix_Draft.md
,Compliance_Matrix_Extended.csv
- CF03:
Episode_2_Q-32859/CF03/output/Hazardous_Area_Component_Matrix.md
,Deviation_Report_Draft.md
,CPQ_PreEntry_List.md
- CF04:
Episode_2_Q-32859/CF04/output/Executive_Summary.md
,Technical_Handoff_Summary.md
,Client_Packet_Skeleton.md
, Manifests (Attachments_Manifest.md
,Quality_Documents_Manifest.md
,Datasheets_CoCs_Manifest.md
,Reference_List.md
),Appendix2_Technical_Deviation_List.md
,Appendix3_Technical_Clarification_List.md
,Submission_Email_Draft.md
- Metrics/Changelog:
Episode_2_Q-32859/Metrics.md
,CHANGELOG_MVP_Updates.md
Quality Gates (Method Asserts)
- profile_set == true → PASS (ADNOC)
- quantity_reconciliation_present == true → PASS (provisional from offer; MR‑pending noted)
- matrix_extended_fields_present true AND prefill_done true → PASS (CSV populated)
- haz_component_matrix_present true AND weakest_link_flag true → PASS (IIB T3 via chiller; IP55 weakest)
- cpq_list_present == true → PASS
- attachments_manifest_present true AND quality_docs_manifest_present true AND reference_list_present == true → PASS
- appendix2_autopopulated true AND appendix3_autopopulated true → PASS (from CF03/CF01)
- annexes_count_recorded true AND prefilled_vs_rfi_tracked true → PASS (Metrics)
Standard Work — Closure (TOTE)
- Test: Verify all asserts above.
- Operate: Assemble
Client_Packet_Skeleton.md
with links to executive summary, matrix (CSV), appendices, and manifests. - Test: Confirm all links resolve; citations present per Citation_Style.
- Exit: Mark Episode 2 closed; record metrics.
Deliverables Checklist (Vault‑relative)
- Executive Summary:
Episode_2_Q-32859/CF04/output/Executive_Summary.md
- Compliance Matrix (CSV MVP):
Episode_2_Q-32859/CF02/output/Compliance_Matrix_Extended.csv
- Appendices:
Episode_2_Q-32859/CF04/output/Appendix2_Technical_Deviation_List.md
,Appendix3_Technical_Clarification_List.md
- Manifests:
Episode_2_Q-32859/CF04/output/Attachments_Manifest.md
,Quality_Documents_Manifest.md
,Datasheets_CoCs_Manifest.md
,Reference_List.md
- Handoff:
Episode_2_Q-32859/CF04/output/Technical_Handoff_Summary.md
- Submission Email:
Episode_2_Q-32859/CF04/output/Submission_Email_Draft.md
Open Items (tracked for Episode 3, but not blocking closure)
- RFI‑1: Confirm IIC T3 end‑to‑end for H₂
- RFI‑2: Confirm power topology (single 415 VAC 3Φ feed; chiller provides 230/240 VAC 1Φ)
Metrics & Logging
- Update
Episode_2_Q-32859/Metrics.md
with final counts and notes. - Append run notes in
CHANGELOG_MVP_Updates.md
(done).
Exit Criteria
- All asserts green; metrics logged; client packet skeleton complete; open RFIs enumerated.
- Ready for Episode 3 onramp without chat context.