Infinity

Not logged in
Home

❯

Design & Build Workshop

❯

MVP Documentation

❯

Standard Work

❯

reference

❯

Client Profile Baselines

Client Profile Baselines

Use to set Client_Profile at session start. Tailor per project.

ADNOC

  • Required_Area_Class: Zone 1/2 as per datasheet; H₂ units = IIC T3 end‑to‑end
  • Required_T_Class: T3 (H₂); otherwise per datasheet notes
  • Required_Power_Supply: 415 VAC 3Φ for packaged systems; showers often 230/240 VAC 1Φ; chiller may feed shower
  • Power_Topology: Single 415 VAC 3Φ external to chiller; chiller provides 230/240 VAC 1Φ to shower heater/light (ref Offer Q-32859-1 p.4)
  • EMC_Standards: IEC 61000‑6‑2; IEC 61000‑6‑4; IEC 61326; NAMUR NE 21; IEC 62305 (ref RLNG‑000‑IC‑SP‑0801)
  • Tests_Required: FAT; SAT; IFAT; CIT; SIT; include HART DD/FW verification where specified (ref RLNG‑000‑IC‑SP‑0801)
  • Required_IP_Instrument: IP65 outdoor minimum (ref RLNG‑000‑IC‑SP‑0801 §7.4.13)
  • Required_IP_JB_Outdoor: IP65 (ref RLNG‑000‑IC‑SP‑0801 §7.4.13)
  • Required_IP_Control_Panel_Outdoor: IP66 typical (chiller panel) (ref Chiller Datasheet)
  • Required_IP_Motor_Outdoor: IP55 typical; confirm if IP65 mandated (may require upgrade) (ref Chiller Datasheet)
  • Required_JB_Protection: Ex e for instrument JBs unless project mandates Ex d (project‑specific)
  • AVL: Required
  • Language/Signage: Arabic/English; CCR indication via proximity/limit switches
  • Haz_Default: Zone 1 IIB T3 minimum (instruments)
  • Haz_H2: IIC T3 end‑to‑end for H₂ service (confirm in RFI if unclear)
  • Weakest_Link_Method: true
  • Dual_Power_Detected_Default: true (tank shower + chiller)

ARAMCO (example)

  • Required_Area_Class: As per project spec; often Zone 1 IIB/IIC per service
  • Required_T_Class: T4 common; verify project
  • Required_Power_Supply: 480 VAC 3Φ or 380/415 VAC regional; confirm
  • EMC/Surge: As per spec; confirm IEC/EN refs
  • Tests: FAT/SAT; additional per spec
  • AVL: Common
  • Tagging: Traffolyte vs SS; bilingual per spec

SONATRACH (example)

  • Area/T‑Class: As per spec
  • Power: Confirm local distribution
  • Tests/EMC: Per spec
  • AVL/Tagging: Per spec

NMDC (example)

  • Area/T‑Class: As per spec; if ADNOC‑governed project, inherit ADNOC Haz_Default/Haz_H2
  • Power: Confirm; if tank+chiller, default to Dual_Power_Detected_Default
  • EMC/Tests: Per spec; align with ADNOC EMC_Standards when ADNOC‑governed
  • Language/Signage: As per EPC/client; Arabic/English common on local projects
  • JB_Protection: Ex e typical; Ex d when mandated (project‑specific)
  • IP_Baselines: Align to instrument IP65/JB IP65; motors IP55 typical unless specified otherwise

Notes

  • Always set the baseline explicitly in CF01; capture citations.

Loading authentication...

Graph View

Backlinks

  • Master_Sequencing_MVP_Demo
  • Dry-Run Run of Show — Safety Shower MVP (Standards-Enforced)
  • Standards Catalog — Safety Shower MVP
  • Episode 2 — Closure Ritual
  • Episode 2 — Onramp
  • Episode 2 — Retrospective Ritual
  • Episode 3 — Closure Ritual
  • Episode 3 — Onramp
  • Safety Shower MVP

Created with Infinity Constructor © 2025

  • Elynox | Go Further