Episode 4 — Onramp
Purpose
- Reduce time‑to‑flow by coupling tightly to Episode 3 outputs and updated standards. Define a clear, standalone plan to complete Episode 4 tasks without chat context.
Saliency Context
- Project: Q‑32859 (NMDC Ruwais LNG) — folder:
Episode_2_Q-32859/
- Open items: Evidence Pack uploads (EMC/IECEx/Spec extract), D‑003 motor IP pending client mandate
- CSV remains source of truth (XLSX optional)
Method Asserts (carry‑over)
- profile_set == true
- matrix_high_risk_finalized true; evidence_pack_enumerated true
- haz_component_matrix_present true; weakest_link_flag true
- appendices_autopopulated true; client_packet_frozen true
Launch Checklist
- Open runbooks: Safety Shower MVP (with Spec Cross‑walk + Evidence Pack gates), MVP Sequencing
- Standards Toolkit: Standards_Catalog • Evidence_Pack_Checklist • Spec_Crosswalk_Template
- Load Episode 3 outputs:
Episode_2_Q-32859/CF0*/output/*
, matrix CSV - Set context variables: Client_Profile={{Client_Profile}}, EPC={{EPC_Name}}, Power_Topology={{Power_Topology}}, Haz_Default={{Haz_Default}}, Haz_H2={{Haz_H2}}, Language_Signage={{Language_Signage}}, EPC_Overrides={{EPC_Overrides}}
Standard Work (Episode 4)
- Evidence Pack Finalization
- Collect vendor EMC/EMI declarations (IEC 61000‑6‑2/‑6‑4; IEC 61326; NAMUR NE 21) and IECEx/ATEX certificates where applicable.
- Attach PDFs; update Evidence_Pack_Checklist Status → Attached; update
Attachments_Manifest.md
Evidence Pack filenames. - Update matrix Decision_Notes to include Item_IDs where relevant; flip any Partially Compliant rows to Fully Compliant when evidence is attached.
- Client Responses Integration
- If client mandates motor IP65, update D‑003 (Accept/Reject/Upgrade) in Appendix 2; adjust matrix row R‑0008 and CPQ implications accordingly.
- Record clarifications in Appendix 3 with “Why Closed” citation.
- Spec Cross‑walk Instantiation
- Create a project instance from Spec_Crosswalk_Template; fill precise file paths and line ranges for all High‑Risk rows (use Episode 3 citations).
- Link the cross‑walk from the packet or CF02 notes for audit.
- Externalization & Ready‑to‑Send Packet
- Regenerate Executive Summary if decisions changed (e.g., D‑003).
- Confirm packet integrity: manifests enumerate all references; Evidence Pack filenames present; matrix Status_Final consistent.
- Optional: Export XLSX parity if requested.
Pass/Fail Gates
- Evidence_Pack complete (all Partially Compliant rows resolved or explicitly parked with filenames)
- Deviations and appendices synchronized with any client responses
- Spec Cross‑walk completed for all High‑Risk rows
- Packet coherent and ready for external share (no uncited claims)
Handoff Notes
- Episode 4 is self‑contained; run from this page with Episode 3 folder. No chat context required.
- Keep CSV as source of truth; XLSX export at the end if requested.