Infinity

Not logged in
Home

❯

Trial Runs

❯

quality check

❯

Episode 4 — Onramp

Episode 4 — Onramp

Purpose

  • Reduce time‑to‑flow by coupling tightly to Episode 3 outputs and updated standards. Define a clear, standalone plan to complete Episode 4 tasks without chat context.

Saliency Context

  • Project: Q‑32859 (NMDC Ruwais LNG) — folder: Episode_2_Q-32859/
  • Open items: Evidence Pack uploads (EMC/IECEx/Spec extract), D‑003 motor IP pending client mandate
  • CSV remains source of truth (XLSX optional)

Method Asserts (carry‑over)

  • profile_set == true
  • matrix_high_risk_finalized true; evidence_pack_enumerated true
  • haz_component_matrix_present true; weakest_link_flag true
  • appendices_autopopulated true; client_packet_frozen true

Launch Checklist

  • Open runbooks: Safety Shower MVP (with Spec Cross‑walk + Evidence Pack gates), MVP Sequencing
  • Standards Toolkit: Standards_Catalog • Evidence_Pack_Checklist • Spec_Crosswalk_Template
  • Load Episode 3 outputs: Episode_2_Q-32859/CF0*/output/*, matrix CSV
  • Set context variables: Client_Profile={{Client_Profile}}, EPC={{EPC_Name}}, Power_Topology={{Power_Topology}}, Haz_Default={{Haz_Default}}, Haz_H2={{Haz_H2}}, Language_Signage={{Language_Signage}}, EPC_Overrides={{EPC_Overrides}}

Standard Work (Episode 4)

  1. Evidence Pack Finalization
  • Collect vendor EMC/EMI declarations (IEC 61000‑6‑2/‑6‑4; IEC 61326; NAMUR NE 21) and IECEx/ATEX certificates where applicable.
  • Attach PDFs; update Evidence_Pack_Checklist Status → Attached; update Attachments_Manifest.md Evidence Pack filenames.
  • Update matrix Decision_Notes to include Item_IDs where relevant; flip any Partially Compliant rows to Fully Compliant when evidence is attached.
  1. Client Responses Integration
  • If client mandates motor IP65, update D‑003 (Accept/Reject/Upgrade) in Appendix 2; adjust matrix row R‑0008 and CPQ implications accordingly.
  • Record clarifications in Appendix 3 with “Why Closed” citation.
  1. Spec Cross‑walk Instantiation
  • Create a project instance from Spec_Crosswalk_Template; fill precise file paths and line ranges for all High‑Risk rows (use Episode 3 citations).
  • Link the cross‑walk from the packet or CF02 notes for audit.
  1. Externalization & Ready‑to‑Send Packet
  • Regenerate Executive Summary if decisions changed (e.g., D‑003).
  • Confirm packet integrity: manifests enumerate all references; Evidence Pack filenames present; matrix Status_Final consistent.
  • Optional: Export XLSX parity if requested.

Pass/Fail Gates

  • Evidence_Pack complete (all Partially Compliant rows resolved or explicitly parked with filenames)
  • Deviations and appendices synchronized with any client responses
  • Spec Cross‑walk completed for all High‑Risk rows
  • Packet coherent and ready for external share (no uncited claims)

Handoff Notes

  • Episode 4 is self‑contained; run from this page with Episode 3 folder. No chat context required.
  • Keep CSV as source of truth; XLSX export at the end if requested.

Loading authentication...

Graph View

Backlinks

  • Episode 3 — Closure Ritual

Created with Infinity Constructor © 2025

  • Elynox | Go Further