Infinity

Not logged in
Home

❯

Trial Runs

❯

quality check

❯

Episode 5 — Onramp (Q 32705)

Episode 5 — Onramp (Q-32705)

Objective

  • Reduce time-to-flow by providing a pre-wired checklist, references, and saliency map that connects Episode 5 to project scope and the overall MVP.

Context

  • Project: Q-32705 — Saipem COMP3 | Client_Profile: Other (Qatar Energy; Saipem EPC)
  • Prior: Episode 4 closed; Evidence Pack enumerated; decisions integrated; Spec Cross‑walk complete

Scope Alignment (MVP & Project)

  • MVP: CF04 externalization readiness proven; Episode 5 focuses on light packaging refinements and pre‑handoff quality buffers
  • Project: Ensure any remaining precision work (citations, missing source docs, annex readiness) is completed for a confident external share

Saliency Landscape

  • High‑risk areas to protect:
    • Citations: exact line/section coverage consistency across packet
    • Evidence: EP Item_IDs mirrored across CSV + manifest; attachment readiness
    • Cross‑walk: repo‑relative paths; missing sources handled via RFI
    • Appendices: “Why Closed” lines present; decisions synchronized in CSV Decision_Notes

Inputs (open these)

  • CSV (SoT): Trial Runs/Q-32705/CF02/output/Compliance_Matrix_Extended.csv
  • Spec Cross‑walk: Trial Runs/Q-32705/CF02/output/Spec_Crosswalk_Q-32705.md
  • Evidence Pack Checklist: Trial Runs/Q-32705/CF04/output/Evidence_Pack_Checklist.md
  • Attachments Manifest: Trial Runs/Q-32705/CF04/output/Attachments_Manifest.md
  • Executive Summary: Trial Runs/Q-32705/CF04/output/Executive_Summary.md
  • Appendices: Trial Runs/Q-32705/CF04/output/Appendix2_Technical_Deviation_List.md • .../Appendix3_Technical_Clarification_List.md
  • Standards: Design & Build Workshop/MVP Documentation/Standard Work/reference/Citation_Style.md • .../Spec_Crosswalk_Template.md • .../Evidence_Pack_Checklist.md

Standard Works (Episode 5)

  • SW‑E5‑01: Precision Citation Pass
    • Action: Re‑scan High‑Risk references and confirm exact line ranges; update any approximate citations
    • Pass: Zero approximate line references in external‑facing docs
  • SW‑E5‑02: Evidence Attachment Readiness
    • Action: If vendor PDFs available, switch EP statuses to Attached and update CSV Decision_Notes; else, confirm Parked with filenames
    • Pass: EP status consistent across checklist/manifest/CSV; attachment links validated if present
  • SW‑E5‑03: Missing Source Formalization
    • Action: For any cross‑walk Missing_Source, create/append an RFI entry with exact path and ask for document or alternative citation
    • Pass: All Missing_Source have RFI references
  • SW‑E5‑04: Annex Readiness Sweep
    • Action: Verify annex manifests (Quality Docs, Datasheets & CoCs, Reference List) enumerate only referenced items; ensure consistent naming
    • Pass: Manifests coherent and complete; no orphan entries

TOTE Loops

  • Test: Any approximate citations? Any EP inconsistencies? Any Missing_Source without RFI? Any manifest mismatches?
  • Operate: Execute SW‑E5‑01..04
  • Test: Re‑check; all passes met?
  • Exit: Ready for externalization or park with explicit list and timing

Pass/Fail Gates

  • Citations precision gate: PASS if all High‑Risk citations precise
  • Evidence gate: PASS if EP statuses/status mirroring are consistent
  • Missing source gate: PASS if RFI exists for each Missing_Source
  • Annex gate: PASS if manifests coherent; packet consistent

Notes & Rationale

  • Designed to minimize context switching; ordered for fastest risk‑reduction
  • Aligned to Infinity Method grammar: Streamline entry, Enrich quality, Accelerate handoff

Kickoff Script

  • “Loaded Episode 5 Onramp (Q‑32705). Opening CSV, cross‑walk, evidence, manifests, and appendices. I will ensure citation precision, evidence readiness, formalize any missing sources via RFI, and validate annex coherence before externalization.”

References

  • Grammar & Heuristics: The Infinity Method Grammar • Heuristic - The SEA Framework • The TOTE Framework • Heuristic - The Friction Lens
  • Workflow: Safety Shower RFQ Workflow
  • Standards: Citation_Style • Spec_Crosswalk_Template • Evidence_Pack_Checklist

Operator Scripts (copy/paste)

  • Onramp kickoff: “Loaded Episode 5 Onramp (Q‑32705). Opening CSV, cross‑walk, evidence, manifests, and appendices. I will ensure citation precision, evidence readiness, formalize any missing sources via RFI, and validate annex coherence before externalization.”
  • Precision pass: “Re‑scanning High‑Risk citations for line precision; updating any approximate refs per Citation_Style.”
  • Missing source: “Creating/Linking RFI for Missing_Source in cross‑walk; will enumerate exact ask per Targeted_RFI_Template.”

Loading authentication...

Graph View

Backlinks

  • CHANGELOG — MVP Updates

Created with Infinity Constructor © 2025

  • Elynox | Go Further