Episode 5 — Onramp (Q-32705)
Objective
- Reduce time-to-flow by providing a pre-wired checklist, references, and saliency map that connects Episode 5 to project scope and the overall MVP.
Context
- Project: Q-32705 — Saipem COMP3 | Client_Profile: Other (Qatar Energy; Saipem EPC)
- Prior: Episode 4 closed; Evidence Pack enumerated; decisions integrated; Spec Cross‑walk complete
Scope Alignment (MVP & Project)
- MVP: CF04 externalization readiness proven; Episode 5 focuses on light packaging refinements and pre‑handoff quality buffers
- Project: Ensure any remaining precision work (citations, missing source docs, annex readiness) is completed for a confident external share
Saliency Landscape
- High‑risk areas to protect:
- Citations: exact line/section coverage consistency across packet
- Evidence: EP Item_IDs mirrored across CSV + manifest; attachment readiness
- Cross‑walk: repo‑relative paths; missing sources handled via RFI
- Appendices: “Why Closed” lines present; decisions synchronized in CSV Decision_Notes
Inputs (open these)
- CSV (SoT):
Trial Runs/Q-32705/CF02/output/Compliance_Matrix_Extended.csv
- Spec Cross‑walk:
Trial Runs/Q-32705/CF02/output/Spec_Crosswalk_Q-32705.md
- Evidence Pack Checklist:
Trial Runs/Q-32705/CF04/output/Evidence_Pack_Checklist.md
- Attachments Manifest:
Trial Runs/Q-32705/CF04/output/Attachments_Manifest.md
- Executive Summary:
Trial Runs/Q-32705/CF04/output/Executive_Summary.md
- Appendices:
Trial Runs/Q-32705/CF04/output/Appendix2_Technical_Deviation_List.md
•.../Appendix3_Technical_Clarification_List.md
- Standards:
Design & Build Workshop/MVP Documentation/Standard Work/reference/Citation_Style.md
•.../Spec_Crosswalk_Template.md
•.../Evidence_Pack_Checklist.md
Standard Works (Episode 5)
- SW‑E5‑01: Precision Citation Pass
- Action: Re‑scan High‑Risk references and confirm exact line ranges; update any approximate citations
- Pass: Zero approximate line references in external‑facing docs
- SW‑E5‑02: Evidence Attachment Readiness
- Action: If vendor PDFs available, switch EP statuses to Attached and update CSV Decision_Notes; else, confirm Parked with filenames
- Pass: EP status consistent across checklist/manifest/CSV; attachment links validated if present
- SW‑E5‑03: Missing Source Formalization
- Action: For any cross‑walk Missing_Source, create/append an RFI entry with exact path and ask for document or alternative citation
- Pass: All Missing_Source have RFI references
- SW‑E5‑04: Annex Readiness Sweep
- Action: Verify annex manifests (Quality Docs, Datasheets & CoCs, Reference List) enumerate only referenced items; ensure consistent naming
- Pass: Manifests coherent and complete; no orphan entries
TOTE Loops
- Test: Any approximate citations? Any EP inconsistencies? Any Missing_Source without RFI? Any manifest mismatches?
- Operate: Execute SW‑E5‑01..04
- Test: Re‑check; all passes met?
- Exit: Ready for externalization or park with explicit list and timing
Pass/Fail Gates
- Citations precision gate: PASS if all High‑Risk citations precise
- Evidence gate: PASS if EP statuses/status mirroring are consistent
- Missing source gate: PASS if RFI exists for each Missing_Source
- Annex gate: PASS if manifests coherent; packet consistent
Notes & Rationale
- Designed to minimize context switching; ordered for fastest risk‑reduction
- Aligned to Infinity Method grammar: Streamline entry, Enrich quality, Accelerate handoff
Kickoff Script
- “Loaded Episode 5 Onramp (Q‑32705). Opening CSV, cross‑walk, evidence, manifests, and appendices. I will ensure citation precision, evidence readiness, formalize any missing sources via RFI, and validate annex coherence before externalization.”
References
- Grammar & Heuristics: The Infinity Method Grammar • Heuristic - The SEA Framework • The TOTE Framework • Heuristic - The Friction Lens
- Workflow: Safety Shower RFQ Workflow
- Standards: Citation_Style • Spec_Crosswalk_Template • Evidence_Pack_Checklist
Operator Scripts (copy/paste)
- Onramp kickoff: “Loaded Episode 5 Onramp (Q‑32705). Opening CSV, cross‑walk, evidence, manifests, and appendices. I will ensure citation precision, evidence readiness, formalize any missing sources via RFI, and validate annex coherence before externalization.”
- Precision pass: “Re‑scanning High‑Risk citations for line precision; updating any approximate refs per Citation_Style.”
- Missing source: “Creating/Linking RFI for Missing_Source in cross‑walk; will enumerate exact ask per Targeted_RFI_Template.”